Damage to painted surfaces must be repaired as soon as possible to avoid
corrosion. All painted surfaces on the robot must be inspected.
Required equipment
Note
Equipment, etc.
See Touch up paint for Foundry Prime robots in
partlist
Touch up paint Foundry Prime 2, grey
Additional equipment - Foundry Prime
Note
Article number
Equipment
Mercasol. Recommended
drying time is 24h.
3HAC034903-001
Rust preventive
3HAC026759-001
Sikaflex 521FC
12340011-116
Loctite 574
Brush
3HAC035355-001
Foundry Prime touch up kit
Inspection and repair of surface treatment
Use this procedure to inspect the surface treatment on Foundry Prime robots.
Information
Action
Inspect all painted surfaces for damages.
1
Repair damages as described in the instruc-
tion included in the spare part kit.
2
156
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
3 Maintenance
3.3.10 Inspection of surface treatment (Foundry Prime)
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......