Manual Energy Storage Inverter ESI-S
Upon reception 11
—
3 Upon Reception
3.1 What this chapter contains
This chapter gives basic information on how to inspect, transport, identify and store the
ESI-S inverter.
3.2 Delivery inspection
Each ESI-S is delivered in a box designed to protect adequately the equipment during
shipment. Upon reception of the equipment, make sure that the packing is in good
condition. Verify the state of the shock and tilting indicators (if mounted on the
enclosure or on the inverter panels).
3.3 Unpacking instructions
Figure 3: ESI-S packing material opened
After removal of the top cover, check visually the exterior and interior of your inverter for
transportation damage.
Your inverter equipment comes with a package. Verify that all items are present, i.e.:
−
USB storage device containing this manual the electrical drawing
−
the rubber seal to cover a knock-out (to be used for multi-unit operation)
−
the communication cable needed for multi-unit operation
−
the two eyebolts
Any loss or damage should be notified immediately to your ABB representative.
Note: you will also receive a separate box containing AC and DC protection devices which
should be installed as per instructions provided elsewhere in this document.
3.4 Lifting and transportation guidelines
Please note that inverter equipment weighs approximately 130 kilograms. Care should
be taken to ensure that correct handling facilities are used.
In order to transport the equipment use a forklift or similar equipment. ESI-S enclosures
are best transported horizontally.