132 The ESI-Manager user interface
Manual Energy Storage Inverter ESI-S
−
‘Standby level’ and ‘Standby hyst’:
Define the inverter load level in % on which the inverter goes in standby and
comes out of standby.
−
‘Stdby del on’:
Defines the time during which the inverter load level has to be higher than the
upper threshold level before the inverter comes out of standby.
−
‘Stdby del off’:
Defines the time during which the inverter load level has to be smaller than the
lower threshold level before the inverter is put in standby.
7.9.4.2 Setting up the ‘auto restart’ function
For setting up the ‘auto restart’ function, go to
[/Welcome/Settings/Installation set./Start-Stop set.].
In multi-master units these functions need to be set up in each master-unit in order to
obtain full redundancy.
The ‘auto restart’ function when enabled ensures that the inverter restarts automatically
after a power outage if the inverter was on before the power outage occurs. A time delay
can be programmed to define how long after the power returns, the inverter will restart.
When the ‘auto restart’ function is disabled, the inverter will not restart automatically
after a power outage.
−
To enable/disable the ‘auto restart’ function, go to
[/Welcome/Settings/Installation set./Start-Stop set./]
and enable” the auto start option.
−
To program the delay after which the inverter has restart once the power returns,
in the same menu specify the desired delay. This delay in available from the “drop
–down” menu, in “seconds”.
Remark: By default the ‘auto restart’ function is enabled and the delay time is set at 15s.
7.9.4.3 Setting up the system clock