Manual Energy Storage Inverter ESI-S
Operating instructions 179
—
9 Operating instructions
9.1 What this chapter contains
This chapter contains the user operating instructions for the energy storage inverter. It
is assumed that the inverter has been installed and commissioned correctly (cf. previous
chapters). The following operations are discussed:
−
Starting and stopping the inverter
−
Description of the different features:
•
Active and reactive power target
•
Low Voltage Ride Through
•
Islanding
•
Black start (optional)
•
Individual power control (optional)
−
Modifying the user requirements
−
Changing the system temperature unit
−
Consulting inverter measurements
−
Consulting inverter statistics and manufacturer data
−
Inverter behavior on faults – retrieving error information
Note that in the context of this manual, the ESI-Manager is used to operate the inverter.
Background information on the ESI-Manager can be found in
Alternative ways to operate the inverter are:
−
Using the optional PQF-Link software. Refer to the ‘PQF-Link installation and
user’s guide’ for more information on this subject
−
Using Modbus RTU or TCP-IP communication. Refer to document
“2GCS212013A0050-RS-485 Installation and Start-up guide” for more background
information on this subject and to the information provided by your system
integrator.
WARNING: High AC and DC voltage may be present in the inverter enclosure. Do not
operate the unit with the protective panels removed. Do not touch any inverter parts
unless you have ascertained that they do not carry dangerous voltage levels.