52 Electrical installation
Connection procedure
1. Strip the input power cable. Ground the bare shield of the cable (if any) 360
degrees under the grounding clamp. Fasten the grounding conductor (PE) of the
input power cable under the grounding clamp. Connect the phase conductors to
the U1, V1 and W1 terminals. Use a tightening torque of 0.8 N·m (7 lbf·in) for
frame sizes R0…R2, 1.7 N·m (15 lbf·in) for R3 and 2.5 N·m (22 lbf·in) for R4.
3. Strip the input power cable. Ground the bare shield of the cable (if any) 360
degrees under the grounding clamp. Twist the shield to form as short a pigtail as
possible. Fasten the twisted shield under the grounding clamp. Connect the
phase conductors to the U2, V2 and W2 terminals. Use a tightening torque of
0.8 N·m (7 lbf·in) for frame sizes R0…R2, 1.7 N·m (15 lbf·in) for R3 and 2.5 N·m
(22 lbf·in) for R4.
2. Connect the optional brake resistor to the BRK+ and BRK- terminals with a
shielded cable using the same procedure as for the motor cable in the previous
step.
3. Secure the cables outside the drive mechanically.
1
3
2
2
1
Summary of Contents for ACS355 series
Page 1: ...ABB machinery drives User s manual ACS355 drives ...
Page 4: ......
Page 16: ...16 ...
Page 32: ...32 Operation principle and hardware description ...
Page 58: ...58 Electrical installation ...
Page 74: ...74 Start up control with I O and ID run ...
Page 106: ...106 Control panels ...
Page 120: ...120 Application macros ...
Page 178: ...178 Program features ...
Page 338: ...338 Fieldbus control with embedded fieldbus ...
Page 368: ...368 Fault tracing ...
Page 404: ...404 Dimension drawings ...
Page 410: ...410 Appendix Resistor braking ...
Page 434: ...434 Appendix Permanent magnet synchronous motors PMSMs ...