Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Remove both outer gearbox bracket bolts -arrows-.
– Remove bolts -1- for engine carrier.
1.1.1
Removing engine and gearbox without
subframe
– Disconnect drive shafts from gearbox ⇒ Running gear, axles,
steering; Rep. gr. 40 ; Repairing drive shafts; Removing and
installing drive shafts .
– Remove subframe ⇒ Repairing front suspension; Rep. gr.
40 ; Removing and installing subframe, lower suspension link
and anti-roll bar .
Preparing scissor-type assembly platform - VAS 6131- for further
procedure:
– Install engine supports -VAS 6131/3-1- -1- left and -
VAS 6131/3-2- -2- right on scissor-type assembly platform -
VAS 6131- .
– The arrows on the supports point in direction of travel.
Phaeton 2003 ➤
6-cylinder injection engine - Edition 02.2014
1. Removing and installing engine
11