69
Installation Instructions VRC 630 0020095108_00
Operating the controller 7
7.3.6.2 Special function - screed floor drying
Special function
C9
Floor drying
Day
Temp.
HK2
0
0°C
HK3
0
0°C
>Set start day
Activate the
floor-drying
function to "heat dry" a
freshly-laid screed floor according to building regula-
tions.
Settable
parameters
Description
Setting range
Factory set-
ting
HK2 ... HK15
Time schedule for the particular heating circuit
0-29
0
Table 7.17 Settable parameters for floor drying
When floor drying is activated, all the selected operating
modes are interrupted.
The boiler controls the flow temperature of the heating
circuit according to a pre-set program regardless of the
outside temperature.
Target flow temperature on starting day 1: 25°C
Days after star-
ting the function
Target flow temperature for this day
[°C]
1
25
2
30
3
35
4
40
5
45
6-12
45
13
40
14
35
15
30
16
25
17-23
10
(frost protection function, pump in opera-
tion)
24
30
25
35
26
40
27
45
28
35
29
25
Table 7.18 Temperature profile for floor drying
In Menu
C9
the controller displays the operating mode
for floor drying together with the current day and the
associated target flow temperature.
>
Содержание VRC 630
Страница 1: ...GB VRC 630 3 ...
Страница 2: ......
Страница 54: ......
Страница 55: ...For the heating engineer Installation Manual VRC 630 ...
Страница 145: ...91 Installation Instructions VRC 630 0020095108_00 Appendix Declaration of conformity Fig A 1 Declaration of conformity ...
Страница 152: ...0020095108_00 GB 022010 Subject to alterations ...