Taking out of service 7
Operating manual VRC 630 0020095108_00
41
7
Taking out of service
Complete decommissioning may only be carried out by a
competent person. This person is responsible for proper
decommissioning and disassembly.
7.1
Shutting down the heating temporarily
i
If you want to shut down your heating tempo-
rarily, during the holidays for example, then
follow the instructions in the operating
manual for your boiler.
7.2
Switching off the controller temporarily
b
Caution!
Material damage caused by frost!
The frost protection function is only active
when the controller is switched on.
Never switch the controller off when there
is a risk of frost.
Set the main switch of the controller to the
"I" position.
i
If the external sensor of your heating installa-
tion is unable to receive a DCF signal, you will
have to set the time and date manually after
switching on the controller.
Make sure that the time and date are set correctly so
that the preset timer programmes and holiday pro-
gramme will work correctly and the next servicing
appointment can be monitored.
Leave the controller switched on so that you can
keep the system status of the heating installation in
view at all times and can quickly be made aware of
any malfunctions.
Make use of the holiday programme (
¬ Chap. 5.5
) to
save energy costs during your absence.
>
>
>
>
>
1
Fig. 7.1 Switching the controller On/Off
Key
1 Rocker
switch
Press the rocker switch (
1
) to switch the controller
On/Off.
>
Содержание VRC 630
Страница 1: ...GB VRC 630 3 ...
Страница 2: ......
Страница 54: ......
Страница 55: ...For the heating engineer Installation Manual VRC 630 ...
Страница 145: ...91 Installation Instructions VRC 630 0020095108_00 Appendix Declaration of conformity Fig A 1 Declaration of conformity ...
Страница 152: ...0020095108_00 GB 022010 Subject to alterations ...