96
Installation Instructions VRC 630 0020095108_00
Index
Index
A
Accessories ............................................................................. 20
Advance function.................................................................... 10
Anti-legionella function ...........................................................7
C
Commissioning
Initial start-up .................................................................... 46
Switching on the controller ........................................... 45
Controls ..................................................................................... 14
Overview .............................................................................. 14
Customer service and guarantee ...................................... 87
D
Data transfer .......................................................................... 47
De-commissioning the controller ...................................... 84
Declaration of conformity .................................................... 91
Default settings ...................................................................... 89
Disposing of the controller ................................................. 85
E
Electrical installation .............................................................27
Connecting a boiler with eBUS ..................................... 28
Connecting a boiler without eBUS ................................27
Connecting accessories .................................................. 42
Connecting a mixer circuit as a cylinder charging
circuit ................................................................................... 29
Connecting the DCF receiver ......................................... 41
Connection of circulation pump ................................... 29
Connection of DHW cylinder ...........................................32
Connector assignment ......................................................31
External sensor .................................................................. 41
Wiring................................................................................... 29
Energy saving function ......................................................... 10
Equipment and functional description ................................8
Construction and function ................................................8
Operating modes ............................................................... 10
Error causes ............................................................................ 83
Error codes.............................................................................. 83
Error History ........................................................................... 82
Error messages ...................................................................... 82
Error codes and causes .................................................. 83
External sensor .........................................................................4
Fitting the VRC 693 ......................................................... 25
Mounting the DCF receiver ............................................ 24
F
Floor drying ............................................................................. 69
Frost protection function ............................................... 10, 13
Functions .................................................................................. 10
Frost protection function .......................................... 10, 13
Holiday function ................................................................. 10
One-time Cylinder Charging ........................................... 10
Override function .............................................................. 10
Overview .............................................................................. 10
H
Handing over the appliance to the owner........................ 81
Heating circuit ........................................................................ 93
Heating curve ................................................................... 12, 53
Holiday programme ............................................................... 10
Holiday function ................................................................. 10
Holiday programming ...................................................... 52
Hot water temperature ................................................. 53, 54
I
Identifi cation plate ...................................................................4
Information display ................................................................ 61
Installation ............................................................................... 20
Installation Assistant ............................................................ 74
Actuators .............................................................................77
Boilers .................................................................................. 74
Component ..........................................................................77
Heater ...................................................................................77
Language ............................................................................ 74
Preference .......................................................................... 75
Sensors .................................................................................77
Type of use ......................................................................... 76
Installation location ................................................................21
Requirements of the installation location ....................21
Installer level ........................................................................... 18
enabling ............................................................................... 56
exiting .................................................................................. 78
Exiting the Installer level ................................................ 78
Menu structure ................................................................... 16
protecting from unauthorised access ......................... 47
Setting and optimising parameters ............................. 57
Installing the VRC 630 heating controller ...................... 22
Intended use ..............................................................................6
L
Legionella ................................................................................ 93
M
Menu types ............................................................................... 18
Basic display ................................................................ 19, 49
Menus in different operating situations ...................... 19
O
One-time Cylinder Charging ................................................ 10
Operating levels ...................................................................... 18
Installer level ...................................................................... 18
Operator level ..................................................................... 18
Operating modes .................................................................... 10
Содержание VRC 630
Страница 1: ...GB VRC 630 3 ...
Страница 2: ......
Страница 54: ......
Страница 55: ...For the heating engineer Installation Manual VRC 630 ...
Страница 145: ...91 Installation Instructions VRC 630 0020095108_00 Appendix Declaration of conformity Fig A 1 Declaration of conformity ...
Страница 152: ...0020095108_00 GB 022010 Subject to alterations ...