Nynja Build manual 1.4d
28.6 Powerplant
26.6.1 Fuel tank calibration
a) Put a small quantity of fuel into the tanks.
b) Drain the fuel through the fuel pickup connection.
Any remaining fuel is roughly the unusable fuel, although it will be
affected slightly by the flying attitude.
c) Add measured quantities of fuel into the tanks, marking the side of the tanks at
5 litre intervals, starting from zero at the unusable fuel level.
Allow time for the tank levels to balance before marking each level. This
can take a few minutes.
26.6.2 Propeller pitch
Assemble and fit the propeller following the instructions supplied with the propeller.
Set the propeller pitch to that specified in the HADS for your propeller.
Note that some installations are defined on a max static RPM (5000RPM for
912 and 4850 RPM for 912S installations using the Kiev prop 273 and 283
respectively). This means that once the engine has had its initial run up the
propeller pitch may have to be finely adjusted to accurately achieve this. If the RPM
is a long way out when the prop is set on its recommended starting pitch, then the
RPM gauge may not be indicating accurately and may need calibrating with an
optical tachometer (your inspector or local engine service facility should have one).
26.6.3 Engine run-up
Read the engine manual for procedures relating to the first operation of the engine,
and subsequent running-in. Follow all requirements for engine and gearbox oil,
coolant mix etc. .
It may be advisable to tie the aircraft to a solid structure before any engine power
tests, rather than relying on the brakes, particularly on wet grass.
Carburettor balancing on the Rotax engines may be set approximately by comparing
the movements of the throttle levers on the carburettors, however for best results the
balance should be set by a Rotax engineer familiar with vacuum-gauge balancing.
The Engine Installation Checklist will have to be completed with the assistance of
your Inspector.
26.6.4 Throttle Friction
This is adjusted using the two nuts at the port end of the throttle lever torque tube.
Set enough friction by tightening the inboard nut to prevent the throttles from
vibrating open or closed, then lock this setting with the second nut. Do not set any
friction at all on the starboard end of the torque tube.
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...