48
Nynja Build Manual 1.4d
e) The floor should be slid back against the front of the seat front support tube
SKR15
.
It should butt up against the underside curve of the tube, but not
actually pass beneath it, thus preventing the floor from lifting upwards
along its rear edge in negative-g situations.
Mark through from the bottom the positions of the holes for the rudder
pedal mounting bar, and drill the floor to suit.
The floor passes beneath the rudder pedal mounting bar.
f) To further stiffen the floor in the middle of the cockpit, fit the small piece of L-
section aluminium to support the floor, see Figure 56.
This is attached by the bolts which hold the central bracing pieces,
which are fitted later.
g) Install the battery box, and secure it with four bolts with penny washers.
h) Fit the webbing strap, passing right around the box through the slots in the
side of the box, with the buckle at the top.
Leave fitting the battery until later.
2.9 Rudder Pedals
Refer to figure 52.
a) Fit the rudder pedals orientated as shown on the drawing, before attaching the
second of the two L-brackets if they are not already in place.
b) Fit the rudder pedal mounting bar
SKR18
to the top of the lower cabin triangle
tubes
SKR12
, over the top of the floor.
c) Make sure that there are saddle washers between the pedal bar and the floor
but NOT between the floor and the lower cabin tubes
– this may mean
removing a set from the assembly
Figure 52 rudder pedals.
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...