Nynja Build Manual 1.4d
passes under the support bar before looping back up over the tank again,
down and around the support bar on the other side. It looks neatest with the
buckle on the outer side of the tank.
d) The short one passes around the back of the tank and at the front should loop
around the TU27 diagonal tube. Again the buckle is best on the outer side.
e) Pull everything tight, working the tension around the system until even.
f) Finally tie off any loose strap.
12.7 Fuel tank connections
a) The fuel drain should be connected to the fuel balance pipe (the lowest if two
are fitted). Fit the pipe with a T-piece to connect the fuel drain, which must
discharge clear of the aircraft, Figure 229
The fuel drain tap is fitted through the fuselage fairing just behind the
port undercarriage leg. Fit from below with a nylon washer either side of
the fairing. Fitting the fuel pipe pushed down firmly clamps the fitting in
position.
Figure 229 fuel drain.
b) The fuel supply pipe should be connected from the strainer fitting to the fuel
tap. The fuel tap should be mounted between the fuel tanks towards the
starboard side, Figure 230.
The mount for the fuel tap is a small piece of aluminium angle, attached
with a 4mm steel rivet onto the cross-tube below it.
Figure 230 fuel tap, filter and connections
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...