151
Nynja Build Manual 1.4d
c)
Lower edge of firewall sits under the floor plan as shown below don’t fix at this
stage.
Figure 189 position of lower edge of firewall
d) Fit scuttle moulding in position. It can be fixed to the firewall sides in the
position shown below.
The photo shows a reference mark in the moulding
(illustrated by the arrow). Firewall top edge should be positioned 35mm below
this mark as shown.
Figure 190 position of firewall relative to scuttle moulding
e) Fix the firewall edges to the scuttle
– using 3mm countersunk rivets. Use just
one top and one bottom each side for now (t
he rest will be fitted when the
exact position of the cowling screws are determined to ensure even spacing)
Drill a 3mm hole. Then take a 10mm drill bit and apply light pressure to
contersink the glassfibre until the rivet head sits flush..
f) Move now to the top edge of the firewall. This is fixed to the upper forward
edge of the scuttle.
The outer edges will need bending downwards in a slight
curve to match the curve of the moulding. This can be done with some light
hand pressure. The aluminium will also need triming to match the edge of the
moulding. When happy with the fit fix using 3mm countersunk rivets. Use just
two for now 50mm either side of the dead centre. The rest will be fitted when
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...