39
Nynja Build Manual 1.4d
Fig 36 Nynja firewall support brackets, should be fitted on the engine mount bolts at the front
of the SKR
19’s at this stage as shown (normally found packaged with firewall)
Fig37
liaison of TU19’s, TU14 and SKR8
a) Locate the two central cabin tubes
SKR19
onto the front vertical
SKR14
including the steel engine mounting bracket
98
between them. Loosely bolt in
place using the washers and saddle washers.
Aluminium washers
– Note
that TU14 is a different
diameter
– make sure the
correct saddle washers are
used!
7mm and 1mm plastic
washers
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...