139
Nynja Build Manual 1.4d
b) At the rear of the
SKR34
support frame, the tubes are flattened slightly and fit
onto the bolt end protruding upwards from the fuselage at the trailing edge
attachments.
Figure 169 Rear ends of windscreen support frame
c) Slip one of the large diameter heat-shrink rings over each leading edge, and fit
the covered wings to the fuselage.
d) Ensure that the
SKR
34
tubes fit behind the leading edge with around 3-5mm
of clearance, and that the curves of the top tubes match the curve of the large
innermost wing battens, to get a good fit between the Lexan windscreen and
the wing.
Use a long straight edge for this. It may be necessary to tweak the
stainless steel curved piece which joins the upright tubes to the curved
upper tubes, slide it up or down inside the vertical and curved tubes to
get the best position, and to re-drill the holes which secure it.
In the correct position the tubes should be centred, with the centres of
the tops of the tubes around 900mm apart, so that the upper curved
tubes are run parallel back to the rear attachments.
The cabin uprights will then lean slightly outwards from their bases.
Figure 170 Position TU34 uprights 900mm apart
900mm
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...