107
Nynja Build Manual 1.4d
Support the engine on a bench, such as a workmate, chock it up to the
correct height, and offer the fuselage up to it. An engine hoist (which
can be hired from your local hire shop), or some other method of lifting
the engine may be used as an alternative.
Be careful how you support the engine, do not let its weight bear on any
of its many ancillary parts such as the spark plugs, filters etc.
Warning: do not let the engine tip forwards whilst connecting the
upper engine mounts to the mounting plates as damage will occur
to the rear of the engine.
b) Fix the upper starboard rubber engine mount between the two penny washers
with the long 140mm bolt.
c) Fix the upper port rubber engine mount between the two washers with a short
60mm bolt.
d) Fix the lower starboard rubber engine mount between the two washers with a
short 60mm bolt.
e) Fix the lower port rubber engine mount between the two washers with a short
60mm bolt.
A good tip to make this less fiddly is to fix the penny washers to the rubbers in
advance, with a dab of superglue. Saves some washers from rolling across
the workshop floor and quite a bit of profanity..!
Figure 127 upper starboard and lower port mounting bolt.
f) Tighten the bolts to a torque of 38Nm (3.8kgm, 27ftlb).
g) Wire-lock the engine mounting bolts.
7.3
912ULS bracing strap
For 912ULS engines which have high torque and start acceleration an additional
bracing strap is fitted on the port side on the engine. It is not necessary to fit this to
the 912UL engine The strap replaces the snubbing washer on the outside of the top
engine mount rubber and runs down to the replace the subbing washer on the inside
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...