202
Nynja Build manual 1.4d
17.2 Rear windows
a) Cut the windows to the pattern. Leave a little oversize at first.
b) There are two ways they can be fixed relative to the rear edge of the
windscreen:
1. On the UK Nynja demonstrator:
We overlapped with the rear windows sliding underneath the rear edge of the
windscreen by around 25mm and passing over the cabin cross tube centre.
Two strips of 3mm self adhesive foam was used underneath between lexan
and tube, and secured using self tapping screws and a strip of aluminium. We
also used an H section moulding (DIY shop item painted black) to join left and
right halves
Fig 270 windscreen rear edge / rear window interface
– UK demonstrator.
2. Now used on the manufacturers demonstrator in France:
Supplied in the kit are strips of aluminium which can be used to fix the
lexan to and provide a flush butt join which could then be covered with
trim tape. The forward fixing line can be self tapping screws positioned
to pass through the tube centre. The rear coudl be rivets or the black
4mm plastic screws. 3mm foam packing could be used underneath
between the aluminium strip and the tube. In both fxing methods, take
care to allow for the seatbelts and not trap them!
Figure 271 aluminium strips
Содержание Nynja
Страница 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Страница 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Страница 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Страница 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Страница 22: ...22 Nynja Build Manual 1 4d Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Страница 113: ...113 Nynja Build Manual 1 4d Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Страница 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Страница 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Страница 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Страница 268: ...268 Nynja Build manual 1 4d 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 269: ...269 Nynja Build manual 1 4d...
Страница 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Страница 271: ...271 Nynja Build manual 1 4d...
Страница 272: ...272 Nynja Build manual 1 4d...
Страница 273: ...273 Nynja Build manual 1 4d...