3-1
7SJ63 Manual
C53000-G1140-C120-1
Initial Inspections
3
This section describes the first steps that should be taken upon receiving the
SIPROTEC
®
4 7SJ63.
Unpacking and packing is explained.
Visual and electrical checks that are appropriate for initial inspection are discussed.
The electrical tests include navigating through the operating menus of the device us-
ing the operator control panel on the front of the device, and the operator control win-
dows in DIGSI
®
4. For personnel inexperienced with the 7SJ63, these checks also
provide a quick and simple method for understanding the operation of the control pan-
el and DIGSI
®
4. The electrical tests can be done without measuring quantities being
applied.
Observations relevant to long-term storage of the device are noted.
www
. ElectricalPartManuals
. com
Содержание siprotec 7SJ63
Страница 16: ...xiv 7SJ63 Instruction Manual C53000 G1140 C120 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 28: ...Introduction 1 12 7SJ63 Manual C53000 G1140 C120 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 112: ...SIPROTEC 4 Devices 4 38 7SJ63 Manual C53000 G1140 C120 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 346: ...Functions 6 182 7SJ63 Manual C53000 G1140 C120 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 494: ...Technical Data 10 48 7SJ63 Manual C53000 G1140 C120 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 604: ...Index Index 6 7SJ63 Instruction Manual C53000 G1140 C120 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...