
79
Ⅶ
. MAINTENANCE AND AMBIENT ELEMENTS
For safety and normal operation, the inverter shall be provided with daily as well as periodical maintenance.
Diagram below shows items that must be checked.
Check shall again perform after the inverter is powered off for several minutes, to prevent injury to operators caused
by residual power of inverter condenser.
Inspection
item
Inspection
content
Inspection period
Inspection
method
Assessment
base
Corrective
measures to fault
Daily
Annual
Inverter
ambient
environment
Verify ambient
temperature and
humidity
Yes
Measure with
temperature or
humidity meter
in accordance
with notes for
installation
Temperature:
-10 to 40
℃
;
humidity:
below 90%RH
Improve
environments
Check stacking
with inflammable
materials
Yes
View inspection
No foreign
materials
Inverter
installing and
grounding
Check abnormal
vibration to
machine
Yes
View and
auditory
inspection
No foreign
materials
Tighten securing
screws
Check grounding
resistance
complies with
specification
Yes
Measure
resistance with
universal
ohmmeter
200V Class:
below 100Ω
;
400V Class:
below 10Ω
Modify grounding
Input power
supply
voltage
Check main
circuit voltage
Yes
Measure voltage
with universal
meter
Voltage value
complies with
specifications
Modify input power
supply
External
terminal
securing
screws of the
inverter
Check security
of screwed parts
Yes
View inspection
and check
screws are
secured tightly
with screwdriver
All OK
Tighten or sent for
factory
maintenance and
overhaul
Check terminal
board is not
damaged
Yes
Check no clear
rust exists
Yes
Inverter inner
wiring
Check no
distortion
appears
Yes
View inspection
All OK
Replace or sent for
factory
maintenance and
overhaul
Check outer
shielding is not
broken
Yes
View inspection
All OK