iv
AFP-400 Installation
PN 50253:A2 03/12/96
2. Installation
Wiring a Signaling Line Circuit (SLC) ..........................................................2-45
Wire Requirements for a Two-Wire SLC Circuit ..........................................2-46
Wire Requirements for a Four-Wire SLC Circuit .........................................2-47
Two-Wire SLC Communications Loop .........................................................2-48
Four-Wire SLC Communications Loop (NFPA Style 6) ................................2-49
Four-Wire SLC Communications Loop (NFPA 72-1993 Style 7) ..................2-50
Wiring MMX Monitor Modules ....................................................................2-51
Wiring an Isolator Module (ISO-X) .............................................................2-51
MMX Monitor Modules ...............................................................................2-52
SLC Wiring with MMX Monitor Modules ....................................................2-53
SLC Wiring with CMX Control Modules ......................................................2-57
SLC Wiring with a BGX-101L Addressable Manual Pull Station ..................2-63
SLC Wiring with an Intelligent Detector .....................................................2-64
3. Testing the System
Overview .......................................................................................................4-1
AMG-1 Terminal Connections .......................................................................4-2
Low-Level Audio Distribution (Hardwired Connections) .............................4-3
AMG-1 and AMG-E Tone/Message Selections (SW2=Off)..........................4-4
AMG-1 and AMG-E Tone/Message Selections (SW2=On) ..........................4-5
ATG-2 Terminal Connections .......................................................................4-6
Installing a Fire Fighter Telephone (FFT-7 and FFT-7S) ................................4-7
Installing a Fire Fighter Telephone ...............................................................4-8
Installing Audio Amplifiers ..........................................................................4-10
AA-30 Terminals and Connectors ............................................................4-12
AA-100/AA-120 Terminals and Connectors ..............................................4-13
Voice Alarm Modules ...................................................................................4-15
Connecting VCM-4 Speaker Circuits .......................................................4-16
Connecting VCM-4 Telephone Circuits ...................................................4-17
Setting the VCM-4 to Speaker or Telephone Mode .................................4-18
Connecting Dual Channel Module Circuits ............................................4-19
System Configuration Drawings ..................................................................4-20
30 Watt/Four and Eight Speaker Circuits .................................................4-25
120 Watt/Four and Eight Speaker Circuits ...............................................4-26
90 Watt/Eight Speaker Circuit Configuration ..........................................4-27
240 Watt/Eight Speaker Circuit Configuration ........................................4-28
180 Watt/Eight Speaker Circuit Configuration ........................................4-29
30 Watt Dual Channel Configuration ......................................................4-30
120 Watt Dual Channel Configuration ....................................................4-31
120 Watt Dual Channel Configuration ....................................................4-32
Voice Message Options ...............................................................................4-33
ACT-1 Audio Coupling Transformer ............................................................4-34
ACT-1 Audio Coupling Transformer ............................................................4-35
4. Voice Modules
Central or Remote Station Fire Alarm System ...............................................5-1
Auxiliary Fire Alarm System ...........................................................................5-2
NFPA 72-1993 Remote Station Fire Alarm System .........................................5-3
NFPA 72-1993 Proprietary Fire Alarm Systems ..............................................5-4
Network Interface Board ..............................................................................5-5
NIB-96 Assembly ...........................................................................................5-5
SLC and EIA-485 Connections ......................................................................5-6
5. Applications
Continued on the next page...
Periodic Testing and Service..........................................................................3-1
Acceptance Test .............................................................................................3-1
Operational Checks.......................................................................................3-1
Testing the System.........................................................................................3-2
Battery Checks and Maintenance ..................................................................3-2