5-20
AFP-400 Installation
PN 50253:A2 03/12/96
Connecting an
N-ARA-10 Agent
Release-Abort Station
Connecting Releasing Devices, continued
SLC to CPU-400
Typical Connections
Typical Connections for an N-ARA-10 Agent Release-Abort Station
1) For releasing applications, use an end-of-line device (PN REL-47K available
from Notifier) with the CMX module. Use an end-of-line device (PN
REL-4.7K available from Notifier) with the control panel releasing circuit
(one of the four notification circuits).
2) All wiring for releasing circuits is supervised against open and shorts.
3) Connect the end-of-line device as shown in the diagram.
4) Program the module or notification circuit for REL CKT ULC type code.
5) For NFPA 13 and 15 applications, disable the Soak Timer; for NFPA 16
applications, set the Soak Timer to 10 or 15 minutes.
6)
In applications not requiring power limiting
a) ELRs (PN 47K) are not
required; however, the releasing device circuit is not supervised against
shorts; b) Limited energy cable cannot be used for wiring of a releasing
device circuit; c) Maintain a 1/4 spacing between the releasing circuit device
wiring and any power limited circuit wiring; and d) Program the releasing
circuit for type code RELEASE CKT.