Installation Preparations
MyPower S6600 Series Routing Switch Installation Manual
2
copyright
©
2015 Maipu All rights reserved.
�
Confirm whether there is enough installation space and handling channel
space.
�
Ensure that the cleanness of the equipment room meets the requirement. Do
not place the device in the environment with lots of dust, such as being
renovated.
2.1.2
2.1.2
2.1.2
2.1.2
Check
Check
Check
Check Power
Power
Power
Power Supply
Supply
Supply
Supply System
System
System
System
The good power system is the basis of the wireless controller starting and stable
running. To meet the power supply requirement of S6600 series routing switch,
please complete the following steps:
Step 1:
Estimate the whole power consumption of the switch.
Step 2:
Select the appropriate power module according to the power consumption and
power supply mode of the switch.
To ensure the normal running of the switch, you need to ensure that the maximum
output power of the power module providing power for the switch is larger than the
whole power consumption of the switch (it is suggested to reserve some power
consumption derating).
Step 3:
Confirm that the power supply system in the installation place can meet the input
requirement of the device power.
Ensure that the power supply system of the installation place is stable and can
meet the parameter requirement of the selected power module, such as input
mode and rated input voltage. For details, refer to
.
�
For the power consumption data of the switch, refer to
Whole Device and Common Modules
.