MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright
©
2015 Maipu All rights reserved.
5
F
F
F
F
I G U R E
I G U R E
I G U R E
I G U R E
1
1
1
1
4
4
4
4 S M 6 6 0 0 - 0 8 - M F
S M 6 6 0 0 - 0 8 - M F
S M 6 6 0 0 - 0 8 - M F
S M 6 6 0 0 - 0 8 - M F
B A C K
B A C K
B A C K
B A C K A P P E A R A N C E
A P P E A R A N C E
A P P E A R A N C E
A P P E A R A N C E D I A G R A M
D I A G R A M
D I A G R A M
D I A G R A M
1.
Device inlet
2.
Air filter
3.
Fan module slot
4.
Power module fan outlet
5.
Grounding screw
1.2
MPU
MPU
MPU
MPU Card
Card
Card
Card
MPU: Main Processing Unit control card
The MPU card is the mandatory card in the SM6600 series routing switch and it