MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright
©
2015 Maipu All rights reserved.
1
2
222
Installation
Installation
Installation
Installation Preparations
Preparations
Preparations
Preparations
This chapter describes the preparations before installing the device and the
related work, including:
2.1 Check Device Running Environment
2.3 Open-Package and Inspection
�
When the device is delivered, there is the packing list. Please confirm whether
the accessories are complete and good according to the items in the packing
list. If there is damaged or loss, please contact Maipu technical staff to
change.
2.1
2.1
2.1
2.1
Check
Check
Check
Check Device
Device
Device
Device Running
Running
Running
Running Environment
Environment
Environment
Environment
2.1.1
2.1.1
2.1.1
2.1.1
Check
Check
Check
Check Equipment
Equipment
Equipment
Equipment Room
Room
Room
Room Conditions
Conditions
Conditions
Conditions
To ensure the normal running of the device, take the corresponding measures to
meet the environment requirement of the device running:
�
Air conditioning and ventilation system can ensure the normal running
temperature and humidity conditions of the device. For details, refer to
Environment Requirement of Equipment Room
�
The good grounding is the basis of the device running and the important
guarantee conditions of preventing lightning and resisting interference.
Ensure that grounding meets the grounding specifications. For details, refer
to
E1 Device Grounding Specifications
.