A6-3-Analyser start up after a long stoppage period
•
Perform the initial start up.
•
Install new ancillary reagents
Description
IDS-iSYS Trigger A
IDS-iSYS Trigger B
IDS-iSYS SYST L
IDS-iSYS WASH S
IDS-iSYS D-SORB
•
For systems using AP Substrate, install a new bottle of AP Substrate in its corresponding position.
•
Once the new bottles are installed, a message proposing an automatic priming is displayed:
•
Click on
to confirm the priming of the product(s).
The analyser starts the priming sequence.
•
Request twice
ALL SYSTEM-FULL PRIMING
from the menu:
•
Install a CCS reagent cartridge.
•
Then perform the qualification profile.
!
Wait for 40 minutes after installing CCS reagent cartridge before starting qualification profile, as
the CCS reagent cartridge temperature must be allowed to equilibrate.
Appendices
IDS-iSYS User Manual - Revision M1
Appendix A-6
A 13
Software version V 14
Содержание IDS-iSYS
Страница 7: ......
Страница 13: ...SECTION 1 Operating principle...
Страница 30: ...SECTION 2 User Interface Software...
Страница 48: ...SECTION 3 Use...
Страница 119: ...SECTION 4 Messages...
Страница 130: ...SECTION 5 Maintenance...
Страница 165: ...SECTION 6 Problems Corrective Action...
Страница 169: ...SECTION 7 System Configuration...
Страница 182: ...Appendices...