5-4-3- Replacement of primary fuses
WARNING:
RISK OF ELECTRIC SHOCK
It is essential for the mains connection to be unplugged during replacement of fuses.
The primary fuses are located in the mains plug located on the left-hand side of the analyser.
•
Switch the analyser o
ff
and unplug the power cable.
•
Using a screwdriver, remove the fuse-holder from its housing.
•
Replace the faulty fuse, ensuring it is of the same value and the same type (time-delay fuse).
•
Return the fuse holder to its housing.
•
Switch the analyser back on and perform the start-up procedure.
Maintenance
5-4-
Analyser Interventions
(continued)
IDS-iSYS User Manual - Revision M1
Maintenance 5-4
128
Software version V 14
Содержание IDS-iSYS
Страница 7: ......
Страница 13: ...SECTION 1 Operating principle...
Страница 30: ...SECTION 2 User Interface Software...
Страница 48: ...SECTION 3 Use...
Страница 119: ...SECTION 4 Messages...
Страница 130: ...SECTION 5 Maintenance...
Страница 165: ...SECTION 6 Problems Corrective Action...
Страница 169: ...SECTION 7 System Configuration...
Страница 182: ...Appendices...