5-1- Daily Maintenance
In the MAINTENANCE menu, select
DAILY MAINTENANCE
:
Daily maintenance activities are presented under a single tab. Certain maintenance activities are carried out
automatically by the system whilst others must be carried out by the operator. In both cases, the maintenance
activities are recorded.
WARNING:
OPENING/CLOSING THE LID
The lid must be opened for this operation.
Always handle the lid carefully during opening and closing.
The lid must always be fully open
and the lid support tool must always be
installed
.
Take care not to knock the lid during any analyser intervention.
When the lid is not fully open there is a risk of it falling.
During closing, maintain the lid open when removing the lid support tool, to avoid any
risk of accidental falling.
!
If the analyser is equipped with a locking system, unlock lid before selecting the
MAINTENANCE menu (see page 35).
Close the lid when all maintenance procedures are complete
(see page 36).
Maintenance
5-1- Daily Maintenance
IDS-iSYS User Manual - Revision M1
Maintenance 5-1
115
Software version V 14
Содержание IDS-iSYS
Страница 7: ......
Страница 13: ...SECTION 1 Operating principle...
Страница 30: ...SECTION 2 User Interface Software...
Страница 48: ...SECTION 3 Use...
Страница 119: ...SECTION 4 Messages...
Страница 130: ...SECTION 5 Maintenance...
Страница 165: ...SECTION 6 Problems Corrective Action...
Страница 169: ...SECTION 7 System Configuration...
Страница 182: ...Appendices...