For systems using DSORB solution, a maintenance procedure for the four washers will take place
automatically during the SHUT DOWN procedure. Each shutdown procedure will use the following products:
Description
Quantity
IDS-iSYS WASH S
24 mL
IDS-iSYS D-SORB
3 mL
IDS-iSYS Cuvettes
4 cuvettes
•
Remove all samples.
•
Remove reagent racks and store in accordance with IFU recommendations.
•
Carry out daily maintenance, then if necessary, weekly and monthly maintenance.
•
For systems using AP Substrate, from the MONTHLY MAINTENANCE menu, perform the « Rinsing of the AP
Substrate tubing» maintenance twice to rinse the fluidic circuit following the below steps:
•
Replace the AP Substrate bottle by a 500 mL bottle containing de-ionised water to mimic the AP
Substrate.
•
Click on the corresponding
button in front of this item in the maintenance list.
•
Click on
.When the first step is completed, a message is displayed.
•
Keep
the distilled water bottle in the AP Substrate position
, continue the maintenance by clicking on
.
•
Repeat this procedure a second time.
•
After the two rinsing procedures are completed, perform the « Rinsing of the AP Substrate tubing»
maintenance for a third time to compete the rinse and to empty the fluidic circuit:
•
Keep
the distilled water bottle in the AP Substrate position
.
•
Click on the corresponding
button in front of this item in the maintenance list.
•
Click on
.When the first step is completed, a message is displayed.
•
Replace the bottle containing distilled water with an
empty bottle
. Continue the maintenance by
clicking on
.
•
Empty the liquid waste
•
Empty the solid waste.
•
Waste must be disposed of in accordance with current local regulations (see APPENDIX I: Waste disposal,
page A2).
WARNING:
RISK OF BIOLOGICAL CONTAMINATION
Waste which contains, or has been in contact with, biological specimens must be
considered to pose a potential risk of infection.
Wear disposable gloves when handling waste.
The waste must be disposed of in accordance with current local regulations.
•
Click on
.
•
Click on the liquid waste icon.
Then validate the message confirming the liquid waste emptying.
Appendices
IDS-iSYS User Manual - Revision M1
Appendix A-6
A 9
Software version V 14
Содержание IDS-iSYS
Страница 7: ......
Страница 13: ...SECTION 1 Operating principle...
Страница 30: ...SECTION 2 User Interface Software...
Страница 48: ...SECTION 3 Use...
Страница 119: ...SECTION 4 Messages...
Страница 130: ...SECTION 5 Maintenance...
Страница 165: ...SECTION 6 Problems Corrective Action...
Страница 169: ...SECTION 7 System Configuration...
Страница 182: ...Appendices...