
2.2 Correlation Diagrams of Speed and Payload
D2-146
ME0384-4A
Appendi
x
C
ha
pt
er
2
C
onne
ctabl
e
Ac
tuat
or
s
Correlation diagram of speed and payload for the standard RCP2 rod type
R
A
6
C
Speed (mm/s)
Lead 2.5
Lead 5
Lead 10
Horizontal
Pay
load
(k
g)
Pay
load
(k
g)
Speed (mm/s)
Lead 4
Lead 8
Horizontal
Lead 16
Pay
load
(k
g)
Speed (mm/s)
Lead 4
Lead 16
Vertical
Lead 8
R
A
2
C
R
A
3
C
R
A
4
C
Speed (mm/s)
Lead 2.5
Lead 5
Lead 10
Vertical
Pay
load
(k
g)
Pay
load
(k
g)
Speed (mm/s)
Lead 5
Lead 2.5
Horizontal
Pay
load
(k
g)
Speed (mm/s)
Lead 5
Lead 2.5
Vertical
Speed (mm/s)
Lead 1
Vertical
Pay
load
(k
g)
Horizontal installation
Vertical installation
Speed (mm/s)
Lead 1
Horizontal
Pay
load
(k
g)
Содержание Rcon
Страница 12: ...ME0384 4A ...
Страница 32: ...Actuator Coordinate System Intro 20 ME0384 4A ...
Страница 42: ...1 3 General Specifications A1 9 ME0384 4A Specifications Section Chapter 1 RCON Overview ...
Страница 45: ...ME0384 4A ...
Страница 291: ...ME0384 4A ...
Страница 323: ...ME0384 4A ...
Страница 384: ...1 3 Startup Procedure B1 9 ME0384 4A Startup Section Chapter 1 Overview ...
Страница 420: ...3 6 Precautions B3 15 ME0384 4A Startup Section Chapter 3 Absolute Reset ...
Страница 588: ...6 2 Various Functions B6 81 ME0384 4A Startup Section ...
Страница 606: ...1 5 Predictive Maintenance Function C1 17 ME0384 4A Maintenance Section Chapter 1 Maintenance and Inspection ...
Страница 644: ...2 5 Causes and countermeasures for ELECYLINDER alarms C2 37 ME0384 4A Maintenance Section Chapter 2 Troubleshooting ...
Страница 662: ...1 1 Conforming to safety category D1 17 ME0384 4A Appendix Chapter 1 Conforming to Safety Category ...
Страница 837: ......
Страница 838: ......