
2.2 Correlation Diagrams of Speed and Payload
D2-132
ME0384-4A
Appendi
x
C
ha
pt
er
2
C
onne
ctabl
e
Ac
tuat
or
s
Correlation diagram of speed and payload for the RCP4 slider type (High
output effective / Motor-reversing type)
S
A
7
R
Horizontal installation
Vertical installation
S
A
3
R
S
A
5
R
S
A
6
R
Pay
load
(k
g)
Lead 2
Lead 4
Lead 6
Shown in graph is in
condition of operation
with 0.3G.
Speed (mm/s)
Pay
load
(k
g)
Lead 2
Lead 4
Lead 6
Shown in graph is in
condition of operation
with 0.3G.
Speed (mm/s)
Lead 20 (Operation with 0.5G)
Pay
load
(k
g)
Lead 3
Lead 6
Lead 12
Speed (mm/s)
Lead 20 (Operation with 0.3G)
Horizontal
Shown in graph is in condition of operation with 0.3G.
Pay
load
(k
g)
Lead 3
Lead 6
Lead 12
Speed (mm/s)
Vertical
Shown in graph is in condition of operation with 0.3G.
Lead 20
(Operation with 0.5G)
Pay
load
(k
g)
Lead 4
Lead 8
Lead 16
Speed (mm/s)
Horizontal
Lead 24
Values of Lead 4/8 are in
condition of operation with
0.1G, and Lead 16/24 in 0.3G.
Pay
load
(k
g)
Lead 4
Lead 8
Lead 16
Speed (mm/s)
Vertical
Lead 24
Values of Lead 4/8 are in
condition of operation with
0.1G, and Lead 16/24 in 0.3G.
Pay
load
(k
g)
Lead 3
Lead 6
Lead 12
Speed (mm/s)
Lead 20
(Operation with 0.3G)
Horizontal
Shown in graph is in condition of operation with 0.3G.
Pay
load
(k
g)
Lead 3
Lead 6
Lead 12
Speed (mm/s)
Vertical
Shown in graph is in condition of operation with 0.3G.
Lead 20
(Operation with 0.5G)
Lead 20 (Operation with 0.5G)
Содержание Rcon
Страница 12: ...ME0384 4A ...
Страница 32: ...Actuator Coordinate System Intro 20 ME0384 4A ...
Страница 42: ...1 3 General Specifications A1 9 ME0384 4A Specifications Section Chapter 1 RCON Overview ...
Страница 45: ...ME0384 4A ...
Страница 291: ...ME0384 4A ...
Страница 323: ...ME0384 4A ...
Страница 384: ...1 3 Startup Procedure B1 9 ME0384 4A Startup Section Chapter 1 Overview ...
Страница 420: ...3 6 Precautions B3 15 ME0384 4A Startup Section Chapter 3 Absolute Reset ...
Страница 588: ...6 2 Various Functions B6 81 ME0384 4A Startup Section ...
Страница 606: ...1 5 Predictive Maintenance Function C1 17 ME0384 4A Maintenance Section Chapter 1 Maintenance and Inspection ...
Страница 644: ...2 5 Causes and countermeasures for ELECYLINDER alarms C2 37 ME0384 4A Maintenance Section Chapter 2 Troubleshooting ...
Страница 662: ...1 1 Conforming to safety category D1 17 ME0384 4A Appendix Chapter 1 Conforming to Safety Category ...
Страница 837: ......
Страница 838: ......