2-23
3 The measurement is completed in four minutes, and coefficient (calculated value)
will be displayed.
If “Fault” is displayed for processing state, follow the instructions given in
“4.12 Troubleshooting when Fault Occurs in Viscometer.”
4 Press OK.
If the OK key is pressed when the process status is “normal end”, the coefficient
will be registered, and the circulation control screen will be displayed.
2.6.2 Operation test of viscometer
●This function allows you to check the viscometer operation and measure the current ink
viscosity. Note that this operation test is not to determine the coefficient.
● It is not necessary to use new ink for operation test.
OK
Cancel
<the previous calibration>
Exec.time 2015/07/07 11:30
< the current calibration >
Exec.time 2009/07/07 12:45
Proc. Status: Ended
Viscometer calibration
HOME
[Stop ]
2015.07.07 12:45
Com=0
Plunger falling time
Plunger falling time
1st
2nd
5th
Average
3rd
4th
Ink temperature XX
( )
Standard X. XXX (mPa
▪
s)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
1st
2nd
5th
Average
3rd
4th
Ink temperature XX
( )
Standard X. XXX (mPa
▪
s)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
Coefficient XXXX
Coefficient XXXX
Ink viscosity XXX
When updating coefficient, press [OK].
Coefficient
OK
[Note]
The coefficient value will not be registered when Cancel is pressed instead of OK key.
[Standard value of the viscometer calibration] 1200 to 2200
*
The value stated above is a reference. There will be no problem even If the coefficient
value displayed is other than stated above as long as data of Plunger falling time fall
within a similar range.
Содержание IJ UX
Страница 1: ...Service Manual HITACHI Printer Model UX Revision July 1 2015 Version ...
Страница 2: ... Revision of UX service manual Revision Chapter Revised Page Frist Edition ...
Страница 15: ...1 9 2 External views Rear side 1 2 2 Main body internal Appearance with inner cover T removed ...
Страница 16: ...1 10 1 2 3 Print head UX E UX D B Air exhaust port ...
Страница 107: ...3 27 Circuit diagram of EZJ127A ...
Страница 108: ...3 28 Circuit diagram of EZJ127B ...
Страница 122: ...3 42 Circuit diagram of EZJ129 ...
Страница 131: ...3 51 3 3 20 Electrical Connection Diagram ...
Страница 132: ...3 52 ...
Страница 188: ...4 55 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Страница 301: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram UX B D 7 1 ...
Страница 302: ...Circulation System Diagram UX E 7 2 ...
Страница 303: ...7 3 Location of Solenoid valve Location of ICU joint Reducing valve Viscometer Pressure sensor Makeup filter Motor Pump ...
Страница 304: ...7 2 Electrical Connection Diagram 7 2 1 Electrical Connection Diagram UX D E 7 4 Electrical Connection Diagram UX D E ...
Страница 305: ...7 5 7 2 2 Electrical Connection Diagram UX B Basic model Electrical Connection Diagram UX B ...
Страница 308: ... Nozzle diameter 65μm 7 8 7 4 Dimensions around charge electrode and deflection electrode ...