Contents
1. Introduction ································································································ 1-1
1.1 Safety precautions ················································································· 1-1
1.2 Structure of each part in the main body ······················································ 1-8
1.2.1 External views ················································································· 1-8
1.2.2 Main body internal ··········································································· 1-9
1.2.3 Print head ······················································································ 1-10
1.3 Installation ··························································································· 1-11
1.3.1 Power supply wiring ··········································································· 1-11
1.3.2 Installation procedure ······································································· 1-13
2. Maintenance work ······················································································· 2-1
2.1 Setting of service personnel maintenance mode ··········································· 2-1
2.2 System environment setup ······································································· 2-4
2.3 Adjustment/operational checkout ······························································· 2-5
2.3.1 Excitation adjustment ········································································· 2-5
2.3.2 Charging voltage confirmation ···························································· 2-8
2.3.3 Phase margin test ············································································ 2-10
2.3.4 Auto phase gain adjustment ······························································· 2-13
2.3.5 Level sensor confirmation ·································································· 2-15
2.3.6 Heating unit confirmation ··································································· 2-17
2.4 Test of solenoid valve/pump ···································································· 2-19
2.5 Download ···························································································· 2-20
2.6 Calibration of viscometer ········································································ 2-22
2.6.1 Calibration of viscometer ··································································· 2-22
2.6.2 Operation test of viscometer ······························································ 2-23
2.7 Circulation system environment setup ······················································ 2-24
2.8 System reset ······················································································· 2-25
2.9 Back up ······························································································ 2-26
2.10 Unit information ·················································································· 2-27
2.11 Handling of the warning ”Product Speed Matching Error”, etc. ····················· 2-29
2.12 Language registration ·········································································· 2-34
2.13 Fault / Warning log management code ···················································· 2-36
2.14 Software option set up ········································································· 2-38
2.14.1 Software option setup for UX-D,E ······················································ 2-38
2.14.2 Standard communication option setup for UX-B ··································· 2-39
2.15 Upgrade option setup for UX-D ····························································· 2-40
2.16 Time of preparing for printing (UX-D,E only) ·············································· 2-42
2.17 Touch screen setup ·············································································· 2-44
2.18 Expiration date management of ink and makeup ········································ 2-45
Содержание IJ UX
Страница 1: ...Service Manual HITACHI Printer Model UX Revision July 1 2015 Version ...
Страница 2: ... Revision of UX service manual Revision Chapter Revised Page Frist Edition ...
Страница 15: ...1 9 2 External views Rear side 1 2 2 Main body internal Appearance with inner cover T removed ...
Страница 16: ...1 10 1 2 3 Print head UX E UX D B Air exhaust port ...
Страница 107: ...3 27 Circuit diagram of EZJ127A ...
Страница 108: ...3 28 Circuit diagram of EZJ127B ...
Страница 122: ...3 42 Circuit diagram of EZJ129 ...
Страница 131: ...3 51 3 3 20 Electrical Connection Diagram ...
Страница 132: ...3 52 ...
Страница 188: ...4 55 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Страница 301: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram UX B D 7 1 ...
Страница 302: ...Circulation System Diagram UX E 7 2 ...
Страница 303: ...7 3 Location of Solenoid valve Location of ICU joint Reducing valve Viscometer Pressure sensor Makeup filter Motor Pump ...
Страница 304: ...7 2 Electrical Connection Diagram 7 2 1 Electrical Connection Diagram UX D E 7 4 Electrical Connection Diagram UX D E ...
Страница 305: ...7 5 7 2 2 Electrical Connection Diagram UX B Basic model Electrical Connection Diagram UX B ...
Страница 308: ... Nozzle diameter 65μm 7 8 7 4 Dimensions around charge electrode and deflection electrode ...