5-17
5.11
Thermistor replacement
1
Remove the four (4) fixing screws, and then pull out the coupling to the direction of the arrow.
2
Remove the banding band and the packing.
[Caution]
Before removing the banding band and the packing, put a mark on the tube by a tape, etc. as the guide
for reassembling the new ones.
Coupling
Banding band
Packing
Tube (transparent)
Coupling
Thermistor
Fixixng screws (2 pieces)
Fixixng screws
(2 pieces)
Banding bands (2 locations)
Packing
[UX-D, B]
[UX-E]
Tube (transparent)
Put a mark here
Put a mark here
Содержание IJ UX
Страница 1: ...Service Manual HITACHI Printer Model UX Revision July 1 2015 Version ...
Страница 2: ... Revision of UX service manual Revision Chapter Revised Page Frist Edition ...
Страница 15: ...1 9 2 External views Rear side 1 2 2 Main body internal Appearance with inner cover T removed ...
Страница 16: ...1 10 1 2 3 Print head UX E UX D B Air exhaust port ...
Страница 107: ...3 27 Circuit diagram of EZJ127A ...
Страница 108: ...3 28 Circuit diagram of EZJ127B ...
Страница 122: ...3 42 Circuit diagram of EZJ129 ...
Страница 131: ...3 51 3 3 20 Electrical Connection Diagram ...
Страница 132: ...3 52 ...
Страница 188: ...4 55 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Страница 301: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram UX B D 7 1 ...
Страница 302: ...Circulation System Diagram UX E 7 2 ...
Страница 303: ...7 3 Location of Solenoid valve Location of ICU joint Reducing valve Viscometer Pressure sensor Makeup filter Motor Pump ...
Страница 304: ...7 2 Electrical Connection Diagram 7 2 1 Electrical Connection Diagram UX D E 7 4 Electrical Connection Diagram UX D E ...
Страница 305: ...7 5 7 2 2 Electrical Connection Diagram UX B Basic model Electrical Connection Diagram UX B ...
Страница 308: ... Nozzle diameter 65μm 7 8 7 4 Dimensions around charge electrode and deflection electrode ...