![Hitachi FSG Series Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/hitachi/fsg-series/fsg-series_technical-catalogue_139455007.webp)
CONTENTS
0/
3
PART II INSTALATION DATA
12
UNITS INSTALLATION _____________ 12/1
12.1 Transportation and Handling _________ 12/3
12.2 RCI (4-Way Cassette Type) __________ 12/4
12.3 RCD (2-Way Cassette Type) _________ 12/8
12.4 RPC (Ceiling Type)________________ 12/12
12.5 RPI (In-the-Ceiling) _______________ 12/15
12.6 RPK (Wall Type)__________________ 12/17
12.7 RPF (Floor Type) /
RPFI (Floor Concealed Type)________ 12/19
12.8 RAS (Outdoor Unit) _______________ 12/21
12.9 Transportation and Installation of
CH Unit _________________________ 12/39
12.10 Optional Accessories ______________ 12/42
12.11 Outdoor Unit Drain-Kit (DBS-26) _____ 12/46
13
REFRIGERANT PIPING
AND REFRIGERANT
CHARGE ________________________ 13/1
13.1 Refrigerant Piping Selection __________ 13/2
13.2 Distributor Line Branch and Header
Branch _________________________ 13/10
13.3 Piping Work Connection
Considerations ___________________ 13/19
13.4 Indoor Unit Piping Work Connection __ 13/24
13.5 Outdoor Unit Piping Work Connection _ 13/28
13.6 Refrigerant Charging Quantity _______ 13/34
13.7 Vacuum and Refrigerant Charge _____ 13/46
13.8 Caution on Refrigerant Leakage______ 13/47
14
DRAIN PIPING ____________________ 14/1
14.1 General__________________________ 14/2
14.2 RCI (4-Way Cassette Type) __________ 14/3
14.3 RCD (2-Way Cassette Type) _________ 14/3
14.4 RPC (Ceiling Type)_________________ 14/4
14.5 RPI (In-the-Ceiling Type) ____________ 14/5
14.6 RPK (Wall Type)___________________ 14/6
14.7 RPF and RPFI (Floor Type and Floor
Concealed Type) __________________ 14/6
14.8 Outdoor Unit Drain-kit (DSB-26) _______ 14/6
15
ELECTRICAL WIRING _____________ 15/1
15.1 General Check ____________________ 15/2
15.2 Electrical Wiring for Outdoor Units _____ 15/2
15.3 Electrical Wiring for Indoor Units ______ 15/4
15.4 Common Wiring ___________________ 15/9
15.5 Wire Sizes ______________________ 15/13
16
INSTALLATION OF
OPTIONAL REMOTE
CONTROLLER____________________ 16/1
16.1 Installation of Remote Control Switch
<PC-P1HE> ______________________ 16/3
16.2 Installation of Remote Control Switch
(Core-Function) <PC-P5H> __________ 16/6
16.3 Installation of Central Station
<PSC-5S>________________________ 16/9
16.4 Installation of 7-day Timer
<PSC-5T>_______________________ 16/18
16.5 Installation of Receiver Kit
<PC-RLH4> _____________________ 16/22
16.6 Installation of Receiver Kit
<PC-RLH9> _____________________ 16/24
16.7 Installation of Receiver Kit
<PC-RLH11> ____________________ 16/25
16.8 Harc ___________________________ 16/27
16.9 FSG - FXG - G7 - HRG – USB/H-
LINK Connection__________________ 16/30
17
TEST RUN _______________________ 17/1
17.1 Checking Before Test Run ___________ 17/2
17.2 Test run procedure by remote control
switch ___________________________ 17/3
17.3 Test run procedure by WIRELESS
remote control switch (PC-LH3A) ______ 17/4
17.4 Test run from outdoor unit side ________ 17/7
17.5 Checking of the refrigerant quantity ___ 17/10
18
TROUBLESHOOTING ______________ 18/1
18.1 Initial Troubleshooting_______________ 18/2
18.2 Alarm Codes ______________________ 18/3
18.3 Troubleshooting in Check mode _______ 18/4
18.4 Troubleshooting by 7-segment display _ 18/10
18.5 Protection control code on 7-segment
display _________________________ 18/16
18.6 Self checking of PCB's using Remote
Control Switch____________________ 18/19
18.7 Self Cheking of Remote Control
Switch __________________________ 18/21
19
MAINTENANCE ___________________ 19/1
19.1 Regular Inspection _________________ 19/2
19.2 Filter Cleaning_____________________ 19/3
20
MISCELLANEOUS NOTES __________ 20/1
20.1 Special Notes _____________________ 20/2
21
STANDARD
SPECIFICATIONS _________________ 21/1
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...