15
/6
ELECTRICAL WIRING
15.3.4
RPI UNITS
The electrical wiring connection for the indoor unit is shown
below.
1. Cut out the center of the rubber bushing in the wiring
connection hole, as shown below.
2. Connect the cable of an optional remote control switch or
an optional extension cable to the connectors on the
printed circuit board inside the electrical box through the
connecting hole in the cabinet.
3. Connect the power supply and earth wires to the
terminals in the electrical box.
4. Connect the wires between the indoor unit and the
outdoor unit to the terminals in the electrical box.
5. Tightly clamp the wires using the cord clamp inside the
electrical box.
6. Seal the wiring connection hole after running the cables
with the seal material (Cover Plate) to protect the unit
from condensate water and insects.
15.3.5
RPK UNITS
The electrical wiring connection for the indoor unit is shown
below.
1. Connect the cable of the remote control switch to the
connectors on the printed circuit board inside the
electrical box through the connecting hole in the cabinet.
2. Connect the power supply and ground wires to the
terminals in the electrical box, attach the ring core
(accessory) to the power source line as shown below and
fix the ring core by using the band (accessory)
?
NOTE:
In the case of using PC-P1HE, remove CN25 wiring.
Otherwise, the PC-P1HE can not function.
3. Connect the wires between the indoor unit and the
outdoor unit to the terminals in the electrical box.
Hole for the right side
Power
Source Line
PCB1
for I.U.
R.C.S
Connecting cable
(Accessory)
Caulking Work
shall be performed
(Field Wiring)
2 Wires non-polatity
Fasten cord by clamp
Hole for Piping
and wiring
Main
Power
Operating
wires
Operating line
Hole of electrical box
Screw for Earth Wire
1N~
220-240V/50Hz
220V/60Hz
(3N~)
Connector
RCS PC-2H2
Optional
Power wires
Transmission wires
RCS PC-1H(E)
Optional
Drain Hose
Liquid Piping
Gas Piping
Wiring connection
Service panel for
electrical box
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...