![Hitachi FSG Series Скачать руководство пользователя страница 301](http://html.mh-extra.com/html/hitachi/fsg-series/fsg-series_technical-catalogue_139455301.webp)
REFRIGERANT PIPING AND REFRIGERANT CHARGE
13
/25
After select the piping direction proceeded to knockout
selected hole, install pipes and seal the piping with the
factory supplied insulation as indicated below:
■
Upper Side
1. Knockout hole
2. Seal piping
■
Rear Side
1. Knockout hole
2. Seal Piping
13.4.4.
RPI – IN-THE-CEILING TYPE
Position of piping connection is the following:
■
RPI (0.8~1.5)
■
RPI (2.0~5.0)
Piping size
Gas Piping
Liquid Piping
RPI-0.8/1.0/1.5
Æ
12.7 (1/2)
RPI-2.0
Æ
6.35 (1/4)
RPI-2.5/3.0
Æ
15.88 (5/8)
RPI-4.0/5.0
Æ
19.05 (3/4)
Æ
9.53 (3/8)
?
NOTE:
When installing pipes, make sure that enough space is
provided for servicing the electrical box.
Keep electrical box and drain pipe access free of piping.
Option 1
Option 2
Factory-Supplied
Sealing Plate
(0.8x118x142 mm)
Refrigerant Gas Piping
Refrigerant Liquid Piping
Seal with
insulation
Sec. P-P
*145
125
95
P
P
38
54
83
M4 Screw
M4 Screw
Sealing Plate
Knockout
Open the Knockout hole
Liquid Piping
Gas Piping
Open the
Knockout hole
50
155
Sealing Plate
M4 screw
Refrigerant Piping
Sealing Plate
Sealing with insulation
A
B
Sec. A-B
Liquid Pipe
Drain Pipe
Gas Pipe
Liquid Pipe
Drain Pipe
Gas Pipe
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...