16
/18
INSTALLATION OF OPTIONAL REMOTE CONTROLLER
16.4
INSTALLATION OF 7-DAY TIMER <PSC-5T>
16.4.1
ACCESSORIES
The packing contains the following parts:
GROUP
HITACHI
Control Timer
3 screws M4x16L For
fixing the Holding
Bracket onto the wall
Cable (1 m)
16.4.2
INSTALLATION SPACE
In case of installing the controllers in vertical line, keep a
distance more than 50 mm between the controllers
vertically. If the distance is insufficient, the front cover of the
controller can not open wide enough
More than 50 mm
16.4.3
INSTALLATION PROCEDURE
1. Insert the edge of the flat head screwdriver into the dent
parts at the bottom of the holding bracket, push and turn
the screwdriver and remove the controller from the
holding bracket as shown in the next figure.
Screwdriver
2. Attach the Timer to the holding bracket and connect the
cable as follows.
n
In case of exposing Remote Control Cable.
1. Fix the holding bracket onto the wall as shown below
2. Select and cut the knockout hole according to the
direction for drawing out the cable
Determine the direction for
drawing out the cable
according to the cable
arrangement and cut the
knockout hole (one of the
positions marked with * in
the left figure).
In case of using accessory
cable, draw out the cable
from one of the knockout
holes at the lower side.
Holding Bracket
Dent part
Controller
Dent
part
Holding
Bracket
Dent part
Holding
Bracket
Screwdriver
Dent
part
Bottom view
Fix the holding bracket with
the mark "
UP" upward
Screw (Accessory)
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...