UNITS INSTALLATION
1. Initial Check
§
Install the CH unit with a proper clearance around it for
maintenance working space, as shown in below figure:
§
Flowing sound of refrigerant may be heard from the
CH unit when the solenoid valve in the CH unit is
activated. Therefore, take the following action to
minimize the sound.
§
(A) Install the CH unit inside the ceiling. As for the
ceiling material, select a material like a plaster board
which minimizes operation sound.
§
(B) Do not install the CH unit in near a bed room or
hospital room.
§
Do not install the CH unit in a hot or humid place like
kitchen to prevent dew condensation on the outer
surface of the CH unit.
§
Pay attention to the following points when the CH is
installed in a hospital or other facilities where there are
electronic waves from medical equipment.
§
(A) Do not install the CH unit where the
electromagnetic wave is directly radiated to the
electrical box or intermediate wiring (operating line).
§
(B) Install the CH unit and components as far as
practical or at least 3 meters from the electromagnetic
wave radiator.
§
(C) Install a noise filter when the power supply emits
harmful noises.
2. Suspension Bolts
§
Select final location and installation direction of the
indoor unit paying careful attention to the space for the
piping, wiring and maintenance.
§
Mount suspension bolts, as shown below.
- For Concrete Slab
- For Steel Beam
-
For Wooden Beam
Suspension
Steel
Anchor Bolt
Concrete
150~160 mm
I-Beam
Suspension Bolts
(W3/8 or M10)
Wooden Bar
(60~90mm Square)
Square Washers
Nuts
Sling Bolt
(W3/8 or M10)
Wooden Beam
Min.
150
600 Access Panel
130
Min. 650
1000 Acce
ss Pan
e
l
Min.
650
Min.
650
Surrounding
in the Ceiling
Service Access
Panel
Min.
650
Min.
650
Min.
150
Unit: mm
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...