AVAILABLE OPTIONAL FUNCTIONS
10
/5
10.1.3.
CANCELLATION OF COMMANDS FROM
REMOTE CONTROL SWITCH AFTER
FORCED STOPPAGE
$
$
$
$
By using the signal from a building management system, the
air conditioners can be stopped and the individual
commands from the remote control switch are canceled.
The basic wiring and time chart are shown below. The
required parts are shown in item 10.1.1
(In case of "Cancellation of Commands from remote control
Switch after forced stoppage function 06" input to #2 and #3
of CN3).
Time Chart:
?
NOTE:
Picking up signal within 10 seconds after power supply
is turned ON is not available due to initializing of
components.
At this function, the B contact can be used by the optional
setting of the remote control switch. The time chart when
using the B contact is shown below.
See item 10.3 Optional Function of RCS "
Cb
" for more
details of contacts A & B.
•
?
NOTE:
Picking up signal within 10 seconds after power supply
is turned ON is not available due to initializing of
components.
10.1.4.
COOLING OR HEATING OPERATION
MODE SETTING
%
%
%
%
By utilizing this function, the cooling or heating operation
mode can be changed by giving a contact signal from the
outside to the unit. The operation mode is followed by the
field-supplied switch or the remote control switch, which is
used last.
(In case of "Cooling or Heating Operation mode Setting
Change by External Input " Signal input to #1 and #2 of CN3
Time Chart:
Power
Source
ON
OFF
ON
OFF
Time
Signal to 1
& 2 of CN3
Control by R.C.S
Unit
Operation
ON
OFF
ON
OFF
Time
Signal to 1
& 2 of CN3
Control by R.C.S
Unit
Operation
COOL
Power
Source
HEAT
HEAT
COOL
HEAT
COOL
Time
Signal to 1
& 2 of CN3
Control by R.C.S
(Heat
Unit
Operation
Control by R.C.S
(Cool)
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...