![Hitachi FSG Series Скачать руководство пользователя страница 327](http://html.mh-extra.com/html/hitachi/fsg-series/fsg-series_technical-catalogue_139455327.webp)
DRAIN PIPING
14
/3
14.2
RCI (4-WAY CASSETTE TYPE)
1. The position of the drain pipe connection is shown below.
2. Prepare a polyvinyl chloride pipe with a 32mm outer
diameter.
3. Fasten the tubing to the drain hose with an adhesive and
the factory-supplied clamp. The drain piping must be
performed with a down-slope pitch of 1/25 to 1/100.
Gradient of Drain Piping
4. Insulate the drain pipe after connecting the drain hose.
Drain Piping
14.3
RCD (2-WAY CASSETTE TYPE)
1. The position of the drain pipe connection is shown below
2. Prepare a polyvinyl chloride pipe with a 32mm outer
diameter.
3 Fasten the tubing to the drain hose with an adhesive and
the factory-supplied clamp. The drain piping must be
performed with a down-slope pitch of 1/25 to 1/100.
Drain Piping
Gradient of Drain Piping
4. Insulate the drain pipe after connecting the drain hose.
Drain Piping Connection
126
278
39
1/25~1/100
Down Slope
Max
.
600mm
1/25~1/100
Down Slope
Insulation
(Factory-Supplied)
Clamp
(Factory-Supplied)
Polyvinyl Chloride Tube
(Field-Supplied)
Insulation (Field-Supplied)
1/25~1/100
Down Slope
Insulation
(Factory-Supplied)
Clamp
(Factory-Supplied)
Polyvinyl Chloride Tube
(Field-Supplied)
Insulation (Field-Supplied)
1/25~1/100
Down Slope
Max
.
500mm
410
260
90
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...