![Hitachi FSG Series Скачать руководство пользователя страница 227](http://html.mh-extra.com/html/hitachi/fsg-series/fsg-series_technical-catalogue_139455227.webp)
REMOTE CONTROLLERS OPERATION
11
/25
11.6.2.
REMOTE CONTROL CABLE (PRC-10E~PRC-30E)
■
For PC-RLH4 and old PC-2H2
The length of the remote control cable for PC-2H2 box is 8
m. If the remote control cable longer than 8 m is needed,
connect a control cable (0.3 mm²
´
3 wires) in the field, with
soldering, or use an optional extension remote control cable.
For the details of the optional remote control cable, refer to
the following table:
Model
Length (m)
Specifications
PRC-10E
10
PRC-15E
15
PRC-20E
20
*PRC-30E
30
*: Production is started after receipt of orders.
?
NOTE:
PC-2H2 has the same functions than PC-P1HE
as indicated in the TCGB0013-07/00
11.6.3.
3P CONNECTOR CABLE
This connector is utilized when the remote ON/OFF device is
connected or signals are taken out on the printed circuit
boards of indoor and outdoor units.
Model
Name
Application
Able to connect
Remarks
PCC-1A
3P Connector cable
Optional functions of
Outdoor Unit PCB
JST connector XARP-3
One set contains five
3P connector cables
Diameter Ø5 Beige Colour
(3 Wires)
Diameter Ø1.32
(Ø0.18
´
12 Wires)
Yellow
(3P)
Indoor Unit PCB Side
Remote Control
Switch Side
3P Female
Connector
1
2
3
Wire Colour
Red
Black White
Connector: EHR-3
of
NIPPON
Clamp Terminal (J.S.T.)
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...