![Hitachi FSG Series Скачать руководство пользователя страница 285](http://html.mh-extra.com/html/hitachi/fsg-series/fsg-series_technical-catalogue_139455285.webp)
REFRIGERANT PIPING AND REFRIGERANT CHARGE
13
/9
Table
¥
: 2 pipes part Multi-kit ~ Last Multi-kit
Pipe Size (
f
mm)
CH Unit
Gas
Liquid
Multi-Kit
HP<5
(after CH-4.0GE)
15.88
9.53
E-42ME1
HP<5
(except after CH-
4.0GE)
19.05
9.53
E-52ME1
5
£
HP<7.5
22.2
9.53
E-82ME1
7.5
£
HP<10
25.4 (22.2)
12.7
(E-82ME1)
E-102ME1
10
£
HP
£
11.5
28.6
12.7
E-102ME1
Table
¦
: Outdoor Unit ~ Header Branch
Multi-Kit Model
Outdoor Unit
3~8 Branches
RAS-8FXG
RAS-10FXG
RAS-20FXG1
RAS-30FXG1
E-88XE3
?
NOTE:
For 20 & 30 HP this is connectable only when capacity
of the Indoor Units after this header is below 13 HP.
Table
§
: 2 pipes part of Line Branch ~ Header Branch
Multi-Kit Model
CH Unit
2~4
Branches
2~6
Branches
2~8
Branches
CH-4.0GE
E-54SE
-
E-58SE
CH-6.5GE
E-54SE
-
E-58SE
CH-11.5G
-
E-86SE3
E-88SE3
?
NOTE:
CH-4.0GE can be used up to 3 branches and up to 6
branches is applicable for CH-6.5GE.
The reducer (field-supplied) can be used to adjust to
the branch pipe when the header branch work is
carried out to the CH-4.0GE.
Table
¨
: Branch ~ Indoor Unit
Pipe Size (
f
mm)
Indoor Unit
Capacity (HP)
Gas
Liquid
Maximum
Length of Liquid
Pipe
0.8 and 1.0
12.7
6.35
30
1.5
12.7
6.35 (*)
15
2.0 and 2.3
15.88
6.35 (*)
15
2.5 and 3.0
15.88
9.53
30
4.0 and 5.0
19.05
9.53
30
?
NOTE:
(*) In case that the liquid pipe for the indoor unit with the
capacity 1.5HP to 2.3HP is longer than 15m, use the
pipe with diameter of
Æ
9.53. (Use filed supplied
reducer if it is necessary)
1. The pipe shown in the above table is applicable for
both: the line branch and the header branch.
In case that the length of the pipe at the end of the
indoor unit exceeds 5m, the liquid and gas pipes need
to increase one size respectively.
2. In the line branch, the length of the pipe between the
terminal branch (farthest from the O.U.) of three pipes
(specified in the figure as "c" and “d”) and the indoor
unit must be less than 5 m, if it is longer than 5 m use
a T-branch to the liquid pipe of three pipes as shown
below. (Use CH-4.0GE and CH6.5GE T-branch with
Æ
12.7, CH-11.5G T-branch with
Æ
15.88, field
supplied).
Correct
Incorrect
3. In the case that the pipe length at the end of two pipes
branch of the Indoor Unit (specified in the figure as "a"
and "b") exceed 5 m, the liquid and gas pipes must be
increased one size respectively.
Outdoor Unit
Side
Outdoor Unit
Side
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...