![Hitachi FSG Series Скачать руководство пользователя страница 329](http://html.mh-extra.com/html/hitachi/fsg-series/fsg-series_technical-catalogue_139455329.webp)
DRAIN PIPING
14
/5
6. Do not connect the drain pipe with sanitary sewage or
any other drainage pipe.
7. When installing the pipe, do not tie the drain pipe and
refrigerant pipe together. Tie the drain pipe as shown
below
8. After completing the drain pipe work, pour water into
the drain pan and check to ensure that water flows
smoothly as indicated in 14.1
14.5
RPI (IN-THE-CEILING TYPE)
1. The position of the drain piping connection is shown in
the next figure.
2. Prepare a polyvinyl chloride tube with a Ø32 mm outer
diameter.
3. Fasten the tube to the drain hose with an adhesive and
the factory-supplied clamp. The drain piping must be
performed with a DOWN-SLOPE pitch of 1/25 to 1/100
4. Insulate the drain pipe after connecting the drain hose.
(drain Piping)
?
NOTE:
When the relative humidity of inlet or ambient air
exceeds 80%, apply an (field-supplied) auxiliary drain
pan beneath the indoor unit as shown below.
Band
Band
Rear Side piping
Rear Side piping
PRI-0.8~1.5
PRI-2~5
Drain Piping
Drain Piping
Electrical box
1/25~1/100 Down Slope
1/25~1/100
Down Slope
Max
.
500 mm
Insulation (Field-Supplied)
Clamp
(Field-Supplied)
Polyvinyl Chloride Tube
(Field-Supplied)
Insulation
(Field-Supplied)
1/25~1/100
Down Slpoe
Indoor Unit
Auxiliary Drain Pan
(Field-Supplied)
To the Atmosphere
Содержание FSG Series
Страница 2: ......
Страница 4: ......
Страница 13: ...3 57 7 1 7 ...
Страница 14: ......
Страница 110: ......
Страница 116: ......
Страница 146: ......
Страница 159: ...CONTROL SYSTEM 9 13 9 6 STANDARD OPERATION SEQUENCE 9 6 1 COOLING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Страница 161: ...CONTROL SYSTEM 9 15 9 6 2 COOLING MAINLY COOLING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Страница 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Страница 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Страница 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Страница 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Страница 169: ...CONTROL SYSTEM 9 23 9 6 6 HEATING MAINLY HEATING OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Страница 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Страница 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Страница 172: ...9 26 CONTROL SYSTEM 9 7 STANDARD CONTROL FUNCTIONS 9 7 1 FREEZING PROTECTION CONTROL DURING COOLING OR DRY OPERATION ...
Страница 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Страница 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Страница 228: ......
Страница 229: ...3 57 167 7 21 7 ...
Страница 230: ......
Страница 287: ...REFRIGERANT PIPING AND REFRIGERANT CHARGE 13 11 GAS LINE LIQUID LINE E 152S E 162M1 E 202M1 E 242S E 302S ...
Страница 324: ......
Страница 344: ......
Страница 376: ......
Страница 423: ......
Страница 424: ...TCGB0023 rev 0 04 04 Printed in Spain ...