background image

Figure 8-2, Pump Rotor

Blood and Anticoagulant Pumps

Note:

Cleaning of the pump rotors and pump housing is recommended
monthly and following fluid spills. A buildup of tubing debris or
fluids may interfere with pump efficiency. The following cleaning
method is recommended.

1. Loosen and remove the pump rotor screw from the center of the pump

rotor as shown in Figure 8-2.

2. Lift the pump rotor out of the pump housing.

3. For routine maintenance, using lint-free gauze or toweling moistened

with clear water, wipe the entire pump rotor. Clean all debris from the
rollers of the pump rotor.

Note:

In the event of a fluid spill in a pump, wash the pump rotor with
cleaning solution followed by a clear water rinse. Do not immerse
the pump rotor in water for an extended period of time.

4. Use lint-free gauze or toweling to dry the pump rotor. If available,

compressed air may be used to dry the pump rotor.

5. Ensure all rollers spin freely on the pump rotor.

6. Clean the pump housing and shaft using lint-free gauze or toweling

moistened with clear water. Remove all debris from the pump housing
and shaft.

Note:

In the event of a spill in the pump, clean the pump housing and
shaft with lint-free gauze or toweling moistened with cleaning
solution followed by a clear water cleaning as described above. Do
not spray the cleaning solution directly into the pump housing.

7. Dry the pump housing and shaft using lint-free gauze or toweling.

8-8

PCS2 Service Manual

Pump Rotor
Screw

Self-loading
Upper Groove

Содержание PCS 2

Страница 1: ...HAEMONETICS PCS 2 Service and Maintenance Manual...

Страница 2: ...HAEMONETICS PCS 2 Part Number 38855 00 Rev D June 2003 HAEMONETICS CORPORATION 400 Wood Road Braintree MA 02184 Service and Maintenance Manual...

Страница 3: ...are the property of Haemonetics Corporation Except where indicated such information and descriptions may not be copied or reproduced by any means or disseminated or distributed without the express pr...

Страница 4: ...or Line Air Detectors 1 and 2 2 3 Compressor 2 3 Front Panel Distribution Board 2 4 Card Cage 2 4 Centrifuge Distribution Card 2 4 Processor Card 2 5 Main Program Chip Assembly 2 5 Safety Card 2 5 Dri...

Страница 5: ...21 Fuse 2 21 Power Supply Assembly 2 21 Replace Todd Power Supply with Todd Power Supply 2 21 Replace Todd Power Supply with Condor Power Supply 2 22 Replace Condor Power Supply with Condor Power Sup...

Страница 6: ...r and Lock Functional Test 3 7 Centrifuge Speed and Bowl Vibration Test 3 7 Donor Lights Test 3 7 Line Sensor Test 3 8 Bowl Optics Signal Test 3 8 Air Detector Test 3 10 PCS2 Functional Test 3 10 Safe...

Страница 7: ...ollection Weight Configuration 5 4 Bowl Configuration 5 5 Testing 5 6 Valves Test 5 6 Weigher Test 5 6 DPM Sensor Test 5 7 Cuff Test 5 7 Display Test 5 7 Keyboard Test 5 8 Centrifuge Testing 5 8 Fluid...

Страница 8: ...2 PCS2 Exploded View with Callouts 7 3 PCS2 Centrifuge Exploded Views with Callouts 7 4 PCS2 Card Cage and Air Filters Exploded Views with Callouts 7 5 PCS2 Power Supply Assembly Exploded Views with C...

Страница 9: ...aintenance cont Air Filters 8 9 Internal Chassis 8 9 Leakage Current Check 8 10 Return Goods Authorization RGA 8 11 RGA Procedure 8 11 Haemonetics Quality Program 8 12 Chapter 9 Technical Bulletins to...

Страница 10: ...tive maintenance procedures Chapter 4 Calibration Describes detailed calibration procedures Chapter 5 Installation and Configuration Describes detailed installation procedures and configuration of pro...

Страница 11: ...he instrument is very reliable and predictable and is designed to withstand substantial abuse There may be times however that a component may fail prematurely or damage may occur during transport or a...

Страница 12: ...e often will reference another procedure For instance when removing the top deck the instructions will ask you to remove the centrifuge Locate the centrifuge removal procedure for instructions on that...

Страница 13: ...ll four fans should be replaced at the same time even if only one is failing Cover Stops 1 Remove the rear panel 2 Remove 2 Phillips head screws for each cover stop to be removed Cuff Connector 1 Remo...

Страница 14: ...the panel and lubricate the grommet inner diameter with silicone vacuum grease to ease the installation of the air detector head Note LED to be located toward the inside of the front panel 3 When rea...

Страница 15: ...card cage boards The cage is ultimately removed along with the backplane card 4 Remove 4 Phillips head screws securing the card cage frame to the cabinet bases 2 in front 2 in back 5 Move the frame t...

Страница 16: ...sing an antistatic IC removal tool for a 32 pin IC gently pull the main program IC from chip location U26 A future program upgrade may also utilize U23 If the IC removal tool is not available use flat...

Страница 17: ...able through the rear panel 4 Disconnect P501 P502 and P506 from the backplane card 5 Disconnect the ground wire at the top deck ground bus that connects to the side panel ground bus 6 Using a 3 8 wre...

Страница 18: ...he plugs are keyed so use the descriptions on the top deck distribution board for identification P605 is for the AC and P606 is for the Blood Line Air Detector 3 LED is located toward the front of uni...

Страница 19: ...eigher arm to the upper standoff ensure the weigher arm is adjusted to be perpendicular to the machine cabinet when the lower standoff is in one of its four positions This may prove to be difficult wi...

Страница 20: ...he load cell s lower standoff Save this setscrew as it will be reinstalled in the replacement standoff 3 Securing the upper standoff unscrew and remove the lower standoff from the load cell assembly N...

Страница 21: ...on on the top deck distribution board P608 is the Saline Valve P609 is the Plasma Valve and P611 is the Donor Valve AC Blood Pump Assembly 1 Remove the rear panel See page 2 2 2 Disconnect P614 and P6...

Страница 22: ...for Platelet Poor Plasma PPP collection Note With a thin wall socket and a bit of experience you may be able to remove these sensors without removing the top deck 1 Remove the rear panel Remove the t...

Страница 23: ...ntered in the top deck cavity to prevent contact of the centrifuge with the cabinet during operation If true centering cannot be achieved ensure that the centrifuge is at least 1 16 from the cabinet m...

Страница 24: ...with skin or eyes It is recommended that eye protection and rubber gloves be worn when using Primer T Do not use near heat or an open flame 1 Ensure the centrifuge cover is in the unlocked or up posit...

Страница 25: ...centrifuge cover Apply a couple of drops of purple Loctite to the previously removed headless shoulder screws and install in the cover Centrifuge Cover Reassembly Notes 1 The hex shoulder screws are d...

Страница 26: ...the handle of the screwdriver until the cap detaches from the knob Note The knob disk is loctited to the knob It may be difficult to detach and require more force to separate it from the knob Do not w...

Страница 27: ...sor assembly out of the centrifuge well 3 When reinstalling place a bead of rtv around sensor housing to seal Note Ensure that the rtv does not cover the face of the detector Bowl Optics Assembly Note...

Страница 28: ...he fiberglass decorative panel to the top cover assembly inside hinge area 2 Remove the 3 Phillips head screws securing the membrane panel to the top cover assembly 3 Simultaneously pull the base of t...

Страница 29: ...he centrifuge cut out 2 Reinstall the top cover onto the top deck assembly using the two Allen head shoulder screws removed above Note Reinstall all ground wires that may have been removed when removi...

Страница 30: ...Install the two spring clips P N 47241 00 over each end as shown reference balloon 50 Note The flat end of the spring clip must be toward the card cage 11 Remove the protective paper from the tape on...

Страница 31: ...move the membrane panel assembly from the top cover assembly and remove the display distribution board from the top cover mounting plate 2 Using a 1 4 wrench or equivalent remove the 6 perimeter 6 32...

Страница 32: ...t P1 P2 and P3 from the centrifuge controller card 3 Disconnect P405 from the centrifuge distribution card and thread the cable through the cabinet to the photoelectric assembly 4 Disconnect P507 from...

Страница 33: ...e Todd Power Supply with Condor Power Supply Note Use the following directions if replacing a Todd power supply assembly P N 37121 00 with a Condor power supply assembly 48895 00 1 Remove front and re...

Страница 34: ...al of the line conditioner Quickslide brown wire to L terminal of the line conditioner and attach the green wire to the GND terminal block of the PCS2 cabinet using 1 Phillips head screw and star wash...

Страница 35: ...ard to the power supply assembly cage 4 Recalibrate the centrifuge referring to the procedure in Chapter 4 Calibration 1 Remove the rear panel See page 2 2 2 Remove the 2 Phillips head screws securing...

Страница 36: ...ner 1 Remove the rear panel See page 2 2 2 Unplug the brown and blue AC power lines from the line conditioner top bottom 3 Using a 11 32 wrench remove the 2 8 32 hex nuts securing the line conditioner...

Страница 37: ...ribution PCB Load Cell DPM Compressor Centrifuge Assy Photoelectric Assy X Line Sensor Bowl Optics Assy Power Supply DIAGNOSTIC CHECK Replaced Part Pumps Valves Weigher Pressure Centrifuge Display Key...

Страница 38: ...rear panel Pressure cuff check for fatigue cracking of the tubing or the cuff material and or leaks when pressurized indicates the need for replacement Membrane panel Pump rotors Pump rotor screws 1 i...

Страница 39: ...ctions Inspection 1 Remove the front and the back panels to gain access to the internal components 2 Inspect for loose or broken electrical connections on all major assemblies Tighten or repair as req...

Страница 40: ...more efficient when both panels are in place but it may be impractical to repeatedly remove and replace the front panel If a voltage measurement is needed be sure the internal temperature has stabiliz...

Страница 41: ...the error by running the cycle test again Isolate problem to power Eng De eng position switch Open Closed or valve current High current Refer to Chapter 6 Troubleshooting 7 Exit the Valves test by pre...

Страница 42: ...re the weigher arm is fully extended with nothing hanging on it Select the Weigher test on the Diagnostics menu by pressing the MODIFY PROGRAM key then press the DRAW key 2 Verify the displayed weight...

Страница 43: ...mpressor on by pressing the CUFF key 3 Verify the cuff inflates to 50 5 mmHg 4 Use the YES key to increase the cuff pressure to 100 5 Verify the cuff inflates to 100 10 mmHg 6 If calibration is requir...

Страница 44: ...Close and lock the centrifuge cover 2 Start the centrifuge by pressing the DRAW key Verify that the centrifuge speed stabilizes to 7000 100 rpm 3 If calibration is required refer to Chapter 4 Calibra...

Страница 45: ...d from the envelope in the Gray Card Replacement Kit 4 Make a note of the Correction Factor written on the back of the gray card 5 Insert the gray card into the optic alignment fixture so that the arr...

Страница 46: ...The actual gray card reading is 2397 digital units or 2 926 VDC The Correction Factor on the back of the gray card 0 829 Optic Digital Gain with Correction Factor 2397 0 829 2891 digital units or Opti...

Страница 47: ...ed screen will read Fluid when empty screen will read Air 4 If an air detector fails the testing refer to the Troubleshooting Chapter 5 Exit the Air Detector test by pressing the MODIFY PROGRAM key 6...

Страница 48: ...D1 and DLAD2 and then press the PRIME key Verify machine advances to the Ready screen 13 Install fluid filled tubing in the BLAD 14 Press the DRAW key and verify that both pumps are turning clockwise...

Страница 49: ...ows Leakage Neutral Closed Polarity Normal 4 Turn on the PCS2 5 Note the reading in microamperes on the meter 6 Depress the GND switch on the meter 7 Change the Polarity switch from Normal to Reverse...

Страница 50: ...ation procedure if the unit has a Todd power supply installed P N 18878 00 1 Measure the power supply voltages at P507 on the backplane card Use pin seven for DC common ground Note Pins 1 thru 7 are a...

Страница 51: ...Adjust the 5V trim pot and the R29 on the power supply board to 5 1 VDC The trim pot is closest to the rear of the machine on right hand side Etched on the board next to the correct pot is R29 and the...

Страница 52: ...stments can be made to the other voltages please check and verify that they are within their respective specifications as described in Figure 4 1 1 Power on the PCS2 in the Diagnostic mode of operatio...

Страница 53: ...the centrifuge and rotate it until the optic beam is reflecting off the aiming dot on the fixture 8 If the optic beam is not centered on the fixture aiming dot loosen the optic assembly but leave snug...

Страница 54: ...displayed on the screen or 0 0 0 08 VDC 15 Replace the optics fixture in the centrifuge rotating it until the optic beam is centered on the gray card 16 Close the centrifuge cover to allow the cover...

Страница 55: ...ducers test by pressing the MODIFY PROGRAM key then exit Utilities by pressing the STOP key twice Cuff 1 Power on the PCS2 into the Utilities mode of operation by pressing and holding the PLASMA key d...

Страница 56: ...Calibration by pressing the DRAW key 4 Select the Weigher by pressing the MODIFY key once until the cursor is pointing to Weigher 5 Extend the weigher arm out until it is perpendicular to the machine...

Страница 57: ...ht is hanging on the arm 6 After the weigher Input value stabilizes press the DRAW key to store the Offset value Now both Offset value and Input should be equal 7 Calibrate the weigher Full Scale valu...

Страница 58: ...calibration method see above or it can be recalibrated to the specific type of collection device prior to its use 8 Remove the 1000 gram weight from the weigher arm 9 Exit A D Calibration by pressing...

Страница 59: ...o the Utilities mode of operation by pressing and holding the PLASMA key during power up until the Utilities menu appears 2 Select Calibration using the MODIFY PROGRAM and DRAW keys Toggle the write p...

Страница 60: ...s around the compressor and the cuff connector 14 Exit Utilities by pressing the STOP key 1 Power on the PCS2 into the Utilities mode of operation by pressing and holding the PLASMA key during power u...

Страница 61: ...by pressing and holding the PLASMA key while switching the power on Hold the PLASMA key until the Utilities menu appears on the display 2 Select Configuration on the Utilities menu by pressing the MO...

Страница 62: ...The following graphic represents the Protocol Selection screen ACCESSIBLE PROTOCOLS PPP WITHOUT SALINE COMP PPP WITH SALINE COMP PPP AND LEUKOCYTE PPP WITH SALINE CLOSED SET PRESS YES NO TO TOGGLE No...

Страница 63: ...nu by pressing the MODIFY PROGRAM key until the arrow points to Configuration then press the DRAW key Toggle the write protect switch on the Processor Card when instructed Remove rear access panel 3 P...

Страница 64: ...the Serial screen MACHINE SERIAL Machine SERIAL 00A000 5 Use the YES and NO keys to change the digit or character selected as indicated by the cursor Use the MODIFY key to advance the cursor to the ne...

Страница 65: ...y in accordance to the center SOP The default value is 1026 10 Press the MODIFY PROGRAM key until Duration in Statistics is displayed Use the YES key to ENABLE and the NO key to DISABLE The default va...

Страница 66: ...ey Verify that at the end of one minute no errors have accumulated in the error log If errors exist determine which valve is causing the error by running the cycle test again Isolate problem to power...

Страница 67: ...e to IN Release the plunger and verify that both indicators return to OUT 5 Install a DPM filter with about 4 of tubing onto the DPM Connect a calibrated sphygmomanometer or equivalent device to the f...

Страница 68: ...nob can be turned an additional 3 8 to 5 8 after the cover lock switches activate 2 If adjustment is required refer to the Chapter 2 Machine Part Replacement Reference Centrifuge Speed and Bowl Vibrat...

Страница 69: ...tics Signal Test 1 Be sure the PCS2 has been powered on for at least 15 minutes before proceeding with this test 2 Select the Transducer test using the MODIFY PROGRAM and DRAW keys 3 Inspect the optic...

Страница 70: ...tic reading with Correction Factor is between 2295 and 3278 digital units or 2 8 to 4 0 Vdc Use the following formula to determine the optic gain with Correction Factor Optic Digital Gain with Correct...

Страница 71: ...ppear showing the status of the four air detector signals Confirm that each air detector can see fluid and air by inserting a piece of fluid filled tubing into each air detector while monitoring the P...

Страница 72: ...AC DLAD1 and DLAD2 and then press the PRIME key Verify machine advances to the Ready screen 13 Install fluid filled tubing in the BLAD 14 Press the Draw key and verify the both pump are turning clockw...

Страница 73: ...t 3 Set the meter switch settings as follows Leakage Neutral Closed Polarity Normal 4 Turn on the PCS2 5 Note the reading in microamperes on the meter 6 Depress the GND switch on the meter 7 Change th...

Страница 74: ...The calibration testing and configuration steps outlined in Chapter 5 excluding Leakage Current and Ground Continuity should be performed The testing and configuration must be performed at the center...

Страница 75: ...00 Cover Lock Functional Yes No Bowl Vibration Functional Yes No Spill Detect Functional Yes No Donor Lights Functional Yes No TRANSDUCERS OPTICS Aim Yes if Adjusted Yes No Open 1 82 or 0 V 0 10 Grey...

Страница 76: ...hine The PCS2 operating protocols use refined technologies which rely on many variables to function If possible procure PCS2 operational training before investigating system performance or product qua...

Страница 77: ...hose which are CPU generated messages and those which are safety system generated messages By design the CPU should always detect problems before the safety system does In most cases the fact that the...

Страница 78: ...lowing pages in numerical order for those that have associated error codes The remaining status and error messages are listed alphabetically The messages are accompanied by a brief description of the...

Страница 79: ...Notes 6 4 PCS2 Service Manual...

Страница 80: ...ities calibrate all the components under A D centrifuge and safety system and configure the language Reset protocol parameters MODIFY key if parameters were different from default values 1 Use air det...

Страница 81: ...ifferent from default values 1 Replace processor card Using Utilities calibrate all the components under A D centrifuge safety system and configure the language Reset protocol parameters MODIFY key if...

Страница 82: ...valve and switch response 2 Swap valve connections at the top deck distribution card to isolate problem to valve or circuit 3 Replace driver card 4 Replace processor card Using Utilities calibrate al...

Страница 83: ...ace safety card 1 Replace driver card 2 Replace safety card 1 Replace safety card 2 Replace processor card Using Utilities calibrate all the components under A D centrifuge safety system and configure...

Страница 84: ...calibrate all the components under A D centrifuge safety system and configure the language Reset protocol parameters MODIFY key if parameters were different from default values 1 Using Diagnostics in...

Страница 85: ...t up Channel 2 state test Safety system did not post fault to register during system start up Channel 2 state test Safety system relay did not open during system start up Channel 1 and 2 air detector...

Страница 86: ...relay did not close during system start up Channel 1 time base test Safety system did not post fault to register during system start up Channel 1 time base test Safety system relay did not open durin...

Страница 87: ...3 75 0 25 VDC by adjusting trim pot located inside line sensor Remove access hole plug If line sensor cannot be calibrated replace line sensor 3 If voltages differ significantly replace processor car...

Страница 88: ...or replace all connections associated with the appropriate valve position switch or replace the valve 6 Replace driver or processor card Using Utilities calibrate all the components under A D centrifu...

Страница 89: ...l parameters MODIFY key if parameters were different from default values 5 If command signal is OK replace either the centrifuge controller card or the centrifuge assembly 1 Check bowl for frozen head...

Страница 90: ...otor and encoder plugs at top deck distribution card to isolate problem 2 Replace pump motor or driver or processor card If CPU recalibrate A D centrifuge and safety system and reconfigure the languag...

Страница 91: ...r driver or processor card If CPU recalibrate A D centrifuge and safety system and reconfigure the language in Utilities Reset protocol parameters MODIFY key if parameters were different from default...

Страница 92: ...s MODIFY key if parameters were different from default values 1 If request to remove filters remains displayed after removing DPM and SPM filters from DPM and SPM within 50 seconds check repair or rep...

Страница 93: ...2 Check repair or replace all electrical connections associated with the BLAD 3 Replace BLAD air detector 4 Replace processor card Using Utilities calibrate all the components under A D centrifuge saf...

Страница 94: ...if parameters were different from default values 1 Check repair or replace all electrical connections associated with the SPM The SPM may be electrically disconnected from the Top Deck PCB if found t...

Страница 95: ...d configure the language Reset protocol parameters MODIFY key if parameters were different from default values 1 Replace driver card 2 Replace processor card Using Utilities calibrate all the componen...

Страница 96: ...ues 1 Use air detector test in Diagnostics to confirm problem 2 Check repair or replace all electrical connections associated with the BLAD air detector 3 With fluid filled tubing installed in the air...

Страница 97: ...A D centrifuge safety system and configure the language Reset protocol parameters MODIFY key if parameters were different from default values 1 Use air detector test in Diagnostics to confirm the pro...

Страница 98: ...cover switch signals 4 Replace processor card Using Utilities calibrate all the components under A D centrifuge safety system and configure the language Reset protocol parameters MODIFY key if parame...

Страница 99: ...This is a highly unusual message which may indicate an intermittently defective DPM or A D circuit Check calibration of DPM in Utilities 2 Replace DPM and calibrate A D and safety system in Utilities...

Страница 100: ...nguage in Utilities Reset protocol parameters MODIFY key if parameters were different from default values 1 Verify that white sleeves are fully seated 2 Check repair or replace all electrical connecti...

Страница 101: ...nd tubing is installed in the air sensor measure the 5 VDC fluid O VDC air at P507 pins 29 for ACAD 31 for BLAD 2 for DLAD 1 and 4 for DLAD 2 4 Replace processor card Using Utilities calibrate all the...

Страница 102: ...optics line sensor placement of the machine in direct sunlight or donor conditions such as lipemic plasma 2 Use Utilities to display the optics and line sensor digital voltages in Diagnostics under T...

Страница 103: ...1 Ensure weigher arm is securely fastened to the load cell upper standoff and the lower standoff rotates as the arm is rotated 2 Ensure weigher arm is aligned perpendicular to the PCS2 when fully exte...

Страница 104: ...if saline compensation is selected The PCS2 does not sense a change in pressure at the DPM in Return The weigher has seen a change in weight during Return 1 Ensure the DPM white sleeve is correctly in...

Страница 105: ...the short saline IV pole is installed 2 Verify proper operation of the plasma and saline valve if saline compensation is used by performing a valve and occlusion test as outlined in the Basic Care and...

Страница 106: ...Fluid not seen by DLAD2 after 40 ml of anticoagulant pumped 1 Ensure proper placement of tubing in DLAD2 2 Ensure no kinks or twists in tubing from ACAD to DLAD2 3 Ensure DLAD2 is clean 4 Press PRIME...

Страница 107: ...the corresponding modes of operation The Fault Registers define the actual fault that was detected Table 6 2 Error Codes of the Fault Register lists the possible error codes explanation of the codes a...

Страница 108: ...00000 Start Test Phase Conducting system start up tests 000700 Stop PCS2 is in Ready mode or STOP or the PUMP START STOP key has been pressed 001C00 Start Application PCS2 is transitioning from the sy...

Страница 109: ...error This fault could also occur if there is any obstruction of the pump during the procedure such as touching the pumps or tubing draped across the pumps 1 Inspect the blood pump and AC pump rotors...

Страница 110: ...ill be summed with the fault code if the air detector is sensing air at the time the fault is detected Table 6 3 Error Codes of the Critical Register Code Critical Fault Description 000100 Motor Movem...

Страница 111: ...vailable for the PCS2 All available parts are listed on pages 7 8 to 7 11 while many of the parts are identified on pages 7 3 to 7 7 by callouts from illustrations To place an order please call the Ha...

Страница 112: ...7 2 PCS2 Service Manual...

Страница 113: ...her Load Cell 36930 00 Pinch Valve Assy 36913 00 IV Pole Mount Assy 37030 00 Rear Panel Assy 35830 00 Fan Assy 37049 00 SPM DPM Assy 37107 00 Membrane Panel Assy 35159 01 AC Air Detector 11383 05 Air...

Страница 114: ...over Collar Lock 37017 00 Cover Bowl Collar Left 36921 00 Cover Bowl Collar Right 35290 00 Headless Shoulder Screw 2 Centrifuge Cover 35294 00 Fluid Sensor Assy 36917 00 Centrifuge Assy 35347 00 Cover...

Страница 115: ...7009 00 CPU Card 35203 00 Safety Card 35200 00 Driver Card 37010 00 Card Cage 35206 00 Backplane Card 35215 00 Centrifuge Distribution Card 17548 00 Air Filter Large 61620 904 Screw 18138 00 Air Filte...

Страница 116: ...ic Assy 48630 00 Condor Power Supply Assembly 35358 00 Power Entry Module Assembly 35358 00 Power Entry Module Assembly 19296 01 Fuse 48102 00 Power Supply Condor 36823 00 Centrifuge Driver Card 35192...

Страница 117: ...36926 00 Blood Pump Assy 38671 00 Pump Rotor Assy 38536 00 Self Loading Bushing 37035 00 Pump Gasket 35367 00 Pump Motor Assy 38071 02 Pump Tube Guide 62311 408 Screw 37040 00 Label Blood Pump 37041 0...

Страница 118: ...2 00 Control Distribution Cable Upgrade Kit 49320 00 Control Panel Distribution Cable 35231 00 Top Cover Decorative Panel Assembly 47242 00 Decorative Panel 35125 02 Retainer Pad 13549 02 Centrifuge A...

Страница 119: ...off 51910 12 Blood Line Air Detector 35159 02 X AC Line Air Detector 35159 01 X Air Detector Grommet 11383 05 Donor Light Assembly 35327 00 Line Sensor Assembly 49730 00 X Line Sensor Gasket 35381 00...

Страница 120: ...0 Grill Filter Large 18137 02 Screws for Filter Grill 61620 904 Air Filter Small 18138 00 Grill Filter Small 18139 02 Drain Tube Assembly 35634 00 Centrifuge Distribution Power Cable 35229 00 Centrifu...

Страница 121: ...ale connector w nut 14036 00 Screw for Rear Panel 61111 104 Miscellaneous Parts and Fixtures Silicone Vacuum Grease 36276 00 Optical Alignment Fixture ETD 5060 X Photographic Gray Card 38372 00 Centri...

Страница 122: ...ng returned Note If the original box cannot be used please repackage the part with your own packaging material Please be sure to protect the used part from shipping damage by filling the void in the b...

Страница 123: ...f procedures performed with the PCS2 Following are instructions for cleaning the various components of the PCS2 Routine Cleaning Schedule The following schedule shows the minimum recommended frequency...

Страница 124: ...on the components However if distilled water is not available use the clearest water available at your center Cleaning the PCS2 Note Certain commercial cleaning agents may not be compatible with comp...

Страница 125: ...om lenses Note A residue of powder from disposable gloves can cause an air detector to incorrectly sense air If a procedure stops due to an air detector incorrectly sensing air clean the air detector...

Страница 126: ...ed Refer to this drawing to understand the cleaning instructions Warning Haemonetics recommends the use of rubber or vinyl gloves to avoid contact with any spilled blood When handling or discarding po...

Страница 127: ...4 To keep the O ring at the base of the centrifuge chuck from cracking apply a small amount of silicone vacuum grease onto the O ring once every month It is not necessary to remove the O ring from the...

Страница 128: ...ain holes and express cleaning solution e Repeat irrigation of drain holes until the drain tube is cleaned Ensure that the attached biohazard waste bag does not overfill Once the drain tube is cleaned...

Страница 129: ...lities mode Fluid Sensor 1 Clean the fluid sensor with a cotton swab moistened with clean water Dry the fluid sensor after cleaning Bowl Optics Lens 1 Wipe the bowl optics lens with lint free gauze or...

Страница 130: ...otor with cleaning solution followed by a clear water rinse Do not immerse the pump rotor in water for an extended period of time 4 Use lint free gauze or toweling to dry the pump rotor If available c...

Страница 131: ...vironment or when particulate matter is visible on the filters It is necessary to clean all air filters 1 Remove the three retainer plates from the air filters with a Phillips head screwdriver 2 Pull...

Страница 132: ...frequent current leakage checks should be performed whenever a major spill occurs on the PCS2 To determine the necessity of a leakage current check after a major spill the qualified trained staff shou...

Страница 133: ...s to be picked up by courier for return to Haemonetics should be handled according to the Haemonetics Hot Line instructions Merchandise shipped in error by Haemonetics will be handled by the Customer...

Страница 134: ...Infection Control Plan as required by OSHA s Bloodborne Pathogens Standard Repackaging of equipment or disposables for return to Haemonetics must comply with U S Department of Transportation regulatio...

Отзывы: