Source Plasma Customers Only
When machines are transferred between center locations, calibration
testing and configuration should be performed prior to placing the
machines into service. The calibration testing and configuration steps
outlined in Chapter 5, excluding Leakage Current and Ground Continuity,
should be performed. The testing and configuration must be performed at
the center it is being transferred to. The PCS2 Machine Transfer
Verification Sheet, on page 5-15, should be completed and kept in the
center’s machine log.
5-14
PCS2 Service Manual
Machine
Transfers
Содержание PCS 2
Страница 1: ...HAEMONETICS PCS 2 Service and Maintenance Manual...
Страница 79: ...Notes 6 4 PCS2 Service Manual...
Страница 112: ...7 2 PCS2 Service Manual...