2-26
PCS2 Service Manual
T
Ta
ab
blle
e 2
2-1
1,, P
PC
CS
S2
2 C
Co
om
mp
po
on
ne
en
ntt C
Ca
alliib
brra
attiio
on
n a
an
nd
d D
Diia
ag
gn
no
os
sttiic
c M
Ma
attrriix
x
CALIBRATE
Replaced Part
A/D: Cuff
A/D: Weigher
A/D: DPM
Centrifuge
Safety System
Bowl Optics
Line Sensor Power Supply
Processor PCB
Safety PCB
Driver PCB
Centrifuge Controller PCB
Front Panel Distribution PCB
Load Cell
DPM
Compressor
Centrifuge Assy
Photoelectric Assy
X
Line Sensor
Bowl Optics Assy
Power Supply
DIAGNOSTIC CHECK
Replaced Part
Pumps
Valves
Weigher
Pressure
Centrifuge
Display
Keyboard
Transducers
Air Detectors
Pump Motor (Blood or AC)
Pinch Valves
(Blood, Plasma, Saline)
Top Deck Distribution PCB
Membrane Panel Assy
Control Panel Distribution Cable
Centrifuge Distribution PCB
Air Detector
(BLAD, ACAD, DLAD 1 or 2)
Fluid Sensor Assy
Cover Switch Assy
Note:
Shaded boxes indicate that a Calibration or Diagnostic Check of the appropriate part needs to be performed.
Содержание PCS 2
Страница 1: ...HAEMONETICS PCS 2 Service and Maintenance Manual...
Страница 79: ...Notes 6 4 PCS2 Service Manual...
Страница 112: ...7 2 PCS2 Service Manual...