
GSM-20H10 User Manual
97
Measurement Operations
Steps
Generally there are the following steps:
a
Connect the external test leads (front-panel or
rear-panel) according to the requires of the test
b
For rear-panel output, set it according to
System->Control->Rear.
c
Set Vsrc or Isrc and Cmpl on the front panel
d
Set other parameters in the parameter area
(Measure interface)
e
Select the required measurement reading
V/I/Ω/M (corresponding to the buttons 7/V,
4/I, 1/Ω, 0/M)
f
Press the Output button to start the
measurement.
NOTE: After starting the measurement, the
measurement function V/I/Ω/M can also be toggled.
State Description
REAR
Display when setting as rear-panel output. Otherwise, it is
the front-panel output
REM
Remote control
Содержание GSM-20H10
Страница 107: ...GSM 20H10 User Manual 105 The operating flow of Grading mode is shown in the figure below ...
Страница 108: ...BASIC OPERATION 106 ...
Страница 110: ...BASIC OPERATION 108 ...
Страница 166: ...SYSTEM SETTINGS 164 ...
Страница 244: ...COMMAND SYNTAX 242 Example ROUTe TERMinals ...