GSM-20H10 User Manual
309
Example
:SENSe1:CURRent:DC:NPLCycles?
Command
[:SENSe[1]]:VOLTage[:DC]:NPLCycles <n>
Function
This Command is used to set the integration period
(speed) for measurements. NPLC (Number of Power
Line Cycles) expresses the integration period by
basing it on the power line frequency. For example,
for a PLC of 1, the integration period would be 1/60
(for 60Hz line power) which is 16.67 msec. NOTE that
this is a global Command. Thus, if you set the speed
for voltage measurements to 10 PLC, then current
and resistor will also set to 10 PLC.
<n> = 0.01 to 10 Power-line cycles per integration
DEFault 1
MINimum 0.01
MAXimum 10
Example
:SENSe1:VOLTage:DC:NPLCycles 0.01
Command
[:SENSe[1]]:VOLTage[:DC]:NPLCycles?
Function
:NPLCycles? Query programmed PLC value.
:NPLCycles? DEFault Query *RST default PLC.
:NPLCycles? MINimum Query minimum PLC.
:NPLCycles? MAXimum Query maximum PLC.
Example
:SENSe1:VOLTage:DC:NPLCycles?
Command
[:SENSe[1]]:RESistance:NPLCycles <n>
Function
This Command is used to set the integration period
(speed) for measurements. NPLC (Number of Power
Line Cycles) expresses the integration period by
basing it on the power line frequency. For example,
for a PLC of 1, the integration period would be 1/60
Содержание GSM-20H10
Страница 107: ...GSM 20H10 User Manual 105 The operating flow of Grading mode is shown in the figure below ...
Страница 108: ...BASIC OPERATION 106 ...
Страница 110: ...BASIC OPERATION 108 ...
Страница 166: ...SYSTEM SETTINGS 164 ...
Страница 244: ...COMMAND SYNTAX 242 Example ROUTe TERMinals ...