GE
DRAFT
V
OLUSON
™ P8 / V
OLUSON
™ P6
DIRECTION 5723243, R
EVISION
6
DRAFT (M
AY
23, 2018)
B
ASIC
S
ERVICE
M
ANUAL
Chapter 4 - Functional Checks
4-3
5.) Hold down the
On/Off
button (see:
) on the control panel for ~3 seconds.
NOTE:
The power for on-board peripheral auxiliary equipments are commonly switched with the
ON/OFF button. The power switch of any attached printer(s) needs to be in ON position before starting
the system. However, be aware some auxiliary equipment may switch itself to standby mode
(e.g., Color video printer) and must therefore be switched on separately.
As soon as the software has been loaded, the system enters 2D-Mode with the probe and application
that were used before the system was shut down. Total time used for start-up is about 2 minutes.
NOTE:
The power for on-board peripheral auxiliary equipments are commonly switched with the
ON/OFF button. So the auxiliary equipment need not to be switched ON/OFF separately.
Figure 4-2 On/Off Button on Control Panel
On/Off Button