GE
DRAFT
V
OLUSON
™ P8 / V
OLUSON
™ P6
DIRECTION 5723243, R
EVISION
6
DRAFT (M
AY
23, 2018)
B
ASIC
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-129
8-41-4
Removal Procedure
1.) Draw the DPS out of the Nest Frame.
8-41-5
Installation Procedure
1.) Install the new parts in the reverse order of removal.
2.) Perform:
FRU8-28: Replacement of the DPS/DPS with Battery - Functional Tests.
Figure 8-187 DPS
Figure 8-188 Drawing the DPS
DPS